BLD-Final | 8/7/2019 | 8/7/2019 | 8/7/2019 | P | PASS |
Brandon Shaw
|
|
|
Please call 30 min ahead Phone #: ###-#### Inspection requested via web by Chase Cheverton
|
DOC - Permit Finaled | 8/7/2019 | 8/7/2019 | 8/7/2019 | P | PASS |
Brandon Shaw
|
|
|
Disreguard previous enrty...
|
Extend Permit 90/180 days | 8/7/2019 | 8/7/2019 | 8/7/2019 | P | DEFR |
Brandon Shaw
|
|
|
Please call 30 min ahead Phone #: ###-#### Inspection requested via web by Chase Cheverton
|
FIRE-Final Inspection | 8/7/2019 | 8/7/2019 | 8/7/2019 | P | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is complete, no fire alarm modifications, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.
Call half hour before // Chase Phone #: ###-####
|
FIRE-Final Inspection | 8/5/2019 | 8/6/2019 | 8/6/2019 | P | FAIL |
Jim Page
|
|
|
509 address is already assigned to the COI tenant space, need to have addressing corrected for this tenant space before life fire safety can be finaled.
Please call 30 min ahead Phone #: ###-#### Inspection requested via web by Chase Cheverton
|
BLD-Ceiling Grid Inspection | 7/25/2019 | 7/29/2019 | 7/29/2019 | P | PASS |
Brandon Shaw
|
|
|
OK to cover...
|
BLD-Framing/Rough-in | 6/10/2019 | 6/10/2019 | 6/10/2019 | P | PASS |
Jim Storey
|
|
|
Shawn- the front address is 507 McGregor and the 509 McGregor is the next door down Phone #: ###-#### need u-value at final.
|