BLD-Final | 1/16/2020 | 1/17/2020 | 1/17/2020 | A | PASS |
Tony Young
|
|
|
Craig Phone #: ###-####
|
DOC - Permit Finaled | 1/17/2020 | 1/17/2020 | 1/17/2020 | P | PASS |
Tony Young
|
|
|
|
BLD-Blower Door Test Results | 1/17/2020 | 1/17/2020 | 1/17/2020 | P | DONE |
Tony Young
|
|
|
Craig Phone #: ###-####//4.2
|
BLD-Energy code compliance | 10/29/2019 | 10/30/2019 | 10/30/2019 | A | PASS |
Tony Young
|
|
|
Craig Phone #: ###-####
|
BLD-Framing/Rough-in | 10/24/2019 | 10/25/2019 | 10/25/2019 | A | PASS |
Tell Riley
|
|
|
Craig Hammett Phone #: ###-####//most corrections made//still need to nail girder A08//ok to insulate and check girder at energy inspection//
|
BLD-Framing/Rough-in | 10/17/2019 | 10/17/2019 | 10/17/2019 | P | FAIL |
Tony Young
|
|
|
Craig Phone #: ###-####,, c/n posted,, brace, nail trusses per engineering,, nail king studs/plate,, fireblock top of fireblace
|
BLD-Wall Bracing | 10/3/2019 | 10/4/2019 | 10/4/2019 | A | PASS |
Jim Storey
|
|
|
shear // Craig Phone #: ###-####
|
BLD-Wall Bracing | 10/2/2019 | 10/3/2019 | 10/3/2019 | A | PART |
Brandon Shaw
|
|
|
First floor only... Bocking to be as per plans, second story, to be inspected at framing rough-in...
|
BLD-Conference | 8/1/2019 | 8/2/2019 | 8/2/2019 | A | PART |
Tony Young
|
|
|
concern of materials in the road/ site not being cleaned up/// talked to Craig,, he will put cones out for the trusses on the edge of the road,, and get with the sub contractors about keeping the area clean,, he said he will also have an employee start the site clean on Monday
|
BLD-Foundation | 6/20/2019 | 6/21/2019 | 6/21/2019 | A | PASS |
Tony Young
|
|
|
wall // john Phone #: ###-####
|
BLD-Footing | 6/13/2019 | 6/14/2019 | 6/14/2019 | A | PASS |
Tony Young
|
|
|
Jon Phone #: ###-####
|