BLD-Final | 1/8/2020 | 1/8/2020 | 1/8/2020 | P | PASS |
Mike Jordan
|
|
|
Sam Phone #: ###-####
|
DOC - Permit Finaled | 1/8/2020 | 1/8/2020 | 1/8/2020 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Blower Door Test Results | 1/8/2020 | 1/8/2020 | 1/8/2020 | P | DONE |
Mike Jordan
|
|
|
5.8
|
BLD-Energy code compliance | 10/24/2019 | 10/25/2019 | 10/25/2019 | A | PASS |
Mike Jordan
|
|
|
Sam Phone #: ###-####
|
BLD-Framing/Rough-in | 10/21/2019 | 10/22/2019 | 10/22/2019 | A | PASS |
Mike Jordan
|
|
|
SAM Phone #: ###-####. All framing issues have been resolved. ok to insulate.
|
BLD-Framing/Rough-in | 10/18/2019 | 10/18/2019 | 10/18/2019 | P | FAIL |
Mike Jordan
|
|
|
sam Phone #: ###-####. Complete lateral bracing on A01, A02, and A03 trusses. Fire block above and either side of archway in hallway. Provide additional 2x4 studs on east garage wall at locations so that trusses above are within 5 inches of a stud. Provide the approved set of plans. Ok to insulate. Correction notice posted.
|
BLD-Wall Bracing | 9/16/2019 | 9/16/2019 | 9/16/2019 | P | PASS |
Mike Jordan
|
|
|
shear // Sam Phone #: ###-####
|
BLD-Foundation | 8/8/2019 | 8/9/2019 | 8/9/2019 | A | PART |
Mike Jordan
|
|
|
Erme-stem wall Phone #: ###-####
|
BLD-Footing | 8/7/2019 | 8/8/2019 | 8/8/2019 | A | PART |
Mike Jordan
|
|
|
Erme Phone #: ###-####
|