Information based on query as of Thursday, May 9, 2024.
Permit Information
Permit NumberBLD19-02080
StatusIssued
Name VISSER BUILDING CO
Site Address 3484 N WINSOME RD
Project NameDarmody Residence
Customer Number 
ePlanReviewYes
Description
**PLAN MODIFICATION - adding retaining wall and patio to front of house JJN 06/23/20** **PLAN MODIFICATION - reconfiguring retaining wall and adding new retaining wall JJN 09/17/19** **HILLSIDE** **WUI FOOTHILLS ZONE A** **PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 4056 sq. ft., three story (first story 3596 sq. ft., second story 460 sq. ft., basement 600 sq. ft.) single family dwelling with 4 bedrooms, 3 bathrooms, approximately 950 sq. ft. of covered patio/porch and a 1055 sq. ft. attached garage per the approved plans and any notations. A-1/DA zoning and setbacks per planning. JJN ***SPRINKLER SYSTEM IS REQUIRED AND BEING PROVIDED, AS NOTED ON SITE PLAN***LGM.A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Foundation8/13/20208/13/20208/13/2020PPART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Ben Sears
BLD-Footing8/6/20208/7/20208/7/2020APASS
DetailsTony Young
Rod *screened* Phone #: ###-####// retaining wall footing SW corner
BLD-Footing8/5/20208/6/20208/6/2020APEND
DetailsTony Young
Rod *screened* Phone #: ###-####// needs soils approval
BLD-Energy code compliance2/13/20202/14/20202/14/2020PPASS
DetailsJim Storey
Rod Phone #: ###-####
BLD-Framing/Rough-in2/4/20202/5/20202/5/2020APART
DetailsTony Young
Rod Phone #: ###-####// ok to insulate,, needs sprinklers passed
BLD-Wall Bracing1/6/20201/6/20201/6/2020PPART
DetailsTony Young
Rod Phone #: ###-####,, exterior ok
BLD-Framing/Rough-in10/21/201910/22/201910/22/2019PCANC
DetailsDave Hannah
ROD- Phone #: ###-####
BLD-Foundation9/24/20199/25/20199/25/2019APART
DetailsTony Young
Would like an early inspection if possible. Hoping
to pour at 9 Phone #: ###-#### Inspection requested via web by Ben Sears.. house walls ok
BLD-Footing9/18/20199/19/20199/19/2019APART
DetailsTony Young
Bob Phone #: ###-####,, work in progress on the house footings,, ok
BLD-Foundation8/22/20198/22/20198/22/2019PPART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Ben Sears,, basement and retaining walls,, work in progress
BLD-Footing8/13/20198/14/20198/14/2019APART
DetailsTony Young
Request early inspection. Would like to pour about 9:30 or 10:00
Please call me to let me know if this can be arranged Phone #: ###-#### Inspection requested via web by Ben Sears,, 1st set of retaining wall footings and basement