BLD-Final | 12/4/2019 | 12/5/2019 | 12/5/2019 | A | PASS |
Mike Jordan
|
|
|
call for garage access code // Anthony Phone #: ###-####
|
DOC - Permit Finaled | 12/5/2019 | 12/5/2019 | 12/5/2019 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Ceiling Grid Inspection | 9/5/2019 | 9/6/2019 | 9/6/2019 | A | CANC |
Mike Jordan
|
|
|
Anthony Phone #: ###-####
|
BLD-Energy code compliance | 9/6/2019 | 9/6/2019 | 9/6/2019 | A | PASS |
Mike Jordan
|
|
|
Anthony Phone #: ###-####. Majority of framing issues were resolved. A letter from the engineer of record is required noting that the rear portal frame header is sufficient prior to issuing a cert. of occupancy.
|
BLD-Framing/Rough-in | 9/5/2019 | 9/6/2019 | 9/6/2019 | A | PASS |
Mike Jordan
|
|
|
Anthony Phone #: ###-####
|
BLD-Framing/Rough-in | 9/3/2019 | 9/4/2019 | 9/4/2019 | P | FAIL |
Mike Jordan
|
|
|
Anthony Phone #: ###-####. Add double 2x6 header over doorway by main entry. Add aditional stud under beam, east wall. Replace the cut LIB in master bath. Justify the header for Single portal frame in master bedroom. Ok to insulate.
|
BLD-Wall Bracing | 8/9/2019 | 8/12/2019 | 8/12/2019 | A | PASS |
Mike Jordan
|
|
|
Anthony Phone #: ###-####
|
BLD-Foundation | 7/18/2019 | 7/18/2019 | 7/18/2019 | P | PASS |
Mike Jordan
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 7/16/2019 | 7/17/2019 | 7/17/2019 | A | PART |
Mike Jordan
|
|
|
Ricardo Phone #: ###-####
|