Information based on query as of Friday, May 17, 2024.
Permit Information
Permit NumberBLD19-02194
StatusFinaled
Name BLACKROCK HOMES LLC
Site Address 2566 E WARM SPRINGS AVE
Project Name33-1 WSV1
Customer NumberGATE CITY
ePlanReviewYes
Description
***W.U.I. FOOTHILLS ZONE A; CLASS "A" ROOF AND NON-COMBUSTIBLE CONSTRUCTION REQUIRED*** Permit for the construction of a new 2485 sq. ft., two story (first story 1683 sq. ft., second story 802 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 117 sq. ft. of covered patio/porch and a 782 sq. ft. attached garage per the approved plans and any notations. Rescheck Energy Compliance. R-1C zoning and setbacks per planning. ***RDP*** ***SPRINKLERS ARE NOT REQUIRED*** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/8/20206/10/20206/10/2020APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Clint Wall
DOC - Permit Finaled6/10/20206/10/20206/10/2020PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results6/8/20206/10/20206/10/2020ADONE
DetailsBrandon Shaw
ACH50- 3.44
BLD-Energy code compliance3/31/20204/6/20204/6/2020APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Framing/Rough-in3/31/20204/2/20204/2/2020APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Wall Bracing3/6/20203/9/20203/9/2020APASS
DetailsDave Hannah
ever Phone #: ###-####082
BLD-Other3/9/20203/9/20203/9/2020APASS
DetailsDave Hannah
sheetrock soffits ok
BLD-Foundation11/7/201911/8/201911/8/2019APASS
DetailsBrandon Shaw
Work in progress...
BLD-Footing11/5/201911/6/201911/6/2019PPASS
DetailsBrandon Shaw
Work in progress...