Information based on query as of Sunday, May 12, 2024.
Permit Information
Permit NumberBLD19-02615
StatusFinaled
Name JOSE PEDROZA CONSTRUCTION
Site Address 5484 N GARY LN
Project NameIdaho Tax & Bookkeeping Office
Customer Number 
ePlanReviewNo
Description
(IDAHO TAX & BOOKKEEPING OFFICE) (DRH19-00160) **This building is NOT fire sprinklered** Permit is for a 675 sq. ft. addition to an existing office building. Work to include the demolition of the existing garage structure, a 675 sq. ft. addition to the southern portion of the existing building, new interior offices, general site work, exterior finishes, new covered entry with ramp, new interior offices, new accessible restroom, foundation, electrical, plumbing and mechanical per the approved plans. Special inspections required per attached Form 310 for concrete placement and post installed concrete anchors. Approval is contingent upon adhering to the approved plans on file and attached engineering. **JHB**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/6/20204/6/20204/6/2020ADONE
DetailsBob Archibald
For final occupancy signature. Ok for perm. Occ.
BLD-Aging Inspection3/25/20203/25/20204/2/2020 PEND
DetailsTony Young
BLD-Final1/14/20201/15/20201/15/2020PPASS
DetailsTony Young
Tony Phone #: ###-####//
FIRE-Final Inspection1/14/20201/15/20201/15/2020APASS
DetailsTroy Cobbley
Life safety passed. Contractor to remove thumbturn dead bolt from main exit, keyed ok prior to the building inspection.

Tony Phone #: ###-####
BLD-Conference1/13/20201/14/20201/15/2020PPART
DetailsTony Young
Tony Phone #: ###-####// conf on final status// walk through
BLD-Final1/13/20201/13/20201/13/2020PNR
DetailsTony Young
Tony Phone #: ###-####,, walk through only,, needs trades, etc
BLD-Wall Bracing12/20/201912/20/201912/20/2019PPASS
DetailsTell Riley
Jose Phone #: ###-####//interior shear walls//
BLD-Energy code compliance12/19/201912/20/201912/20/2019APASS
DetailsTell Riley
after 8 am // Tony Phone #: ###-####/tony will call in for interior shear//insulation ok//
BLD-Framing/Rough-in12/18/201912/18/201912/18/2019PPASS
DetailsTony Young
jose Phone #: ###-####,, ok to insulate,, will also have interior shear later
BLD-Wall Bracing11/18/201911/19/201911/19/2019APART
DetailsTony Young
Tony Phone #: ###-####,, exterior ok,, nailing and straps ok,, ok to cover roof,, interior shear later
BLD-Footing9/25/20199/26/20199/26/2019APASS
DetailsTony Young
Shawn Phone #: ###-#### pour time 10:30