Permit Information
Permit NumberBLD19-02661
StatusFinaled
Name CONNER CONSTRUCTION LLC
Site Address 3809 N SANDPOINT WAY
Project NameKurokawa - Groom Residence
Customer Number 
ePlanReviewYes
Description
***W.U.I. HILLSIDE LOT ZONE A; CLASS "A" ROOF AND NON-COMBUSTIBLE EXTERIOR MATERIALS REQUIRED*** Permit for the construction of a new 2018 sq. ft., one story single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 360 sq. ft. of covered patio/porch and a 820 sq. ft. attached garage per the approved plans and any notations. Prescriptive Energy Compliance. A-1 zoning and setbacks per planning. ***RDP*** **SPRINKLERS ARE NOT REQUIRED*** LGM
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/27/20207/27/20207/27/2020PPASS
DetailsTony Young
Final Inspection Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk
DOC - Permit Finaled7/27/20207/27/20207/27/2020PPASS
DetailsTony Young
BLD-Blower Door Test Results7/27/20207/27/20207/27/2020PPASS
DetailsTony Young
Final Inspection Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk// 3.3
BLD-Aging Inspection4/29/20204/29/20204/30/2020 PASS
DetailsTony Young
BLD-Aging Inspection4/30/20204/30/20204/30/2020 PASS
DetailsTony Young
BLD-Energy code compliance12/13/201912/17/201912/17/2019APASS
DetailsDave Hannah
Insulation inspection. Thank you! Phone #: ###-#### Inspection requested via web by Clayton Conner
BLD-Framing/Rough-in12/3/201912/4/201912/4/2019APASS
DetailsTony Young
Framing inspection. Thank you. Phone #: ###-#### Inspection requested via web by Clayton Conner// fireplace is on main mech permit// ok to insulate
BLD-Framing/Rough-in10/30/201910/31/201910/31/2019APART
DetailsTony Young
Shear Wall inspection. Thank you Phone #: ###-#### Inspection requested via web by Clayton Conner// shear ok
BLD-Foundation9/12/20199/12/20199/12/2019PPASS
DetailsBrandon Shaw
Work in progress...
BLD-Footing9/10/20199/11/20199/11/2019APART
DetailsTony Young
Edgar Phone #: ###-####,, ok,, will get footing protection before final