Information based on query as of Friday, May 3, 2024.
Permit Information
Permit NumberBLD19-03121
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 6095 E FOXGROVE DR
Project NameLot 11 Block 2 Harris North #3
Customer Number 
ePlanReviewYes
Description
**HILLSIDE** **W.U.I. HILLSIDE ZONE A CLASS "A" ROOF AND NON-COMBUSTIBLE EXTERIOR SIDING REQUIRED** **PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 3395 sq. ft., two story (first story 1894 sq. ft., second story 1501 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 488 sq. ft. of covered patio/porch and a 846 sq. ft. attached. JJN ***SPRINKLERS ARE NOT REQUIRED***LGM A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/9/20204/9/20204/9/2020APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
DOC - Permit Finaled4/9/20204/9/20204/9/2020PPASS
DetailsBrandon Shaw
BLD-Final4/8/20204/8/20204/8/2020ANR
DetailsBrandon Shaw
BLD-Final4/7/20204/8/20204/8/2020APASS
DetailsBrandon Shaw
Work in progress...
BLD-Other1/3/20201/6/20201/6/2020APASS
DetailsBrandon Shaw
Soffit Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Other1/3/20201/6/20201/6/2020ACANC
DetailsBrandon Shaw
Soffit Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Energy code compliance1/3/20201/3/20201/3/2020PPASS
DetailsBrandon Shaw
Corrections SAT...
BLD-Energy code compliance12/31/201912/31/201912/31/2019PFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Kyle Seick. Noted that denoted hardware on sheet S1.1 has not yet been installed.
BLD-Framing/Rough-in12/24/201912/27/201912/27/2019AFAIL
DetailsBrandon Shaw
Provide Truss Engineering...
See pg S1.1 for missing hardware...
OK to insulate...
BLD-Wall Bracing12/2/201912/2/201912/2/2019PFAIL
DetailsBrandon Shaw
Renail 2nd floor shear panels, see red crayon...
BLD-Foundation10/9/201910/9/201910/9/2019PPASS
DetailsBrandon Shaw
Work in progress...
BLD-Footing10/7/201910/7/201910/7/2019APASS
DetailsBrandon Shaw
Work in progress...