Information based on query as of Sunday, May 19, 2024.
Permit Information
Permit NumberBLD19-03669
StatusIssued
Name SEAN CAFFERTY ENTERPRISES
Site Address 4068 W HILL RD
Project NameWilliams Garage/ ADU
Customer Number 
ePlanReviewYes
Description
***W.U.I. FOOTHILLS LOT ZONE A; CLASS "A" ROOF AND NON-COMBUSTIBLE EXTERIOR MATERIALS REQUIRED*** CAT II Hillside Permit. Remove carport and build new 890 sq. ft. 2-car garage with a 740 sq. ft. ADU above. Prescriptive Energy Compliance. ***RDP*** ***SPRINKLERS ARE NOT REQUIRED***LGM*** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/17/20206/18/20206/18/2020PPEND
DetailsMike Jordan
Sean *screened* Phone #: ###-####. Needs electrical, public works and zoning finals first. Ok to final after listed final inspections have been completed.
BLD-Energy code compliance3/12/20203/13/20203/13/2020PPASS
DetailsMike Jordan
Sean Phone #: ###-####
BLD-Framing/Rough-in3/9/20203/11/20203/11/2020PFAIL
DetailsMike Jordan
Justin Phone #: ###-####. Foam top plate penetrations above electrical service. Nail off TJI web stiffeners per the plan. Pressure block 2x4 top chord handstack at front of garage. Correction notice posted. Ok to insulate.
BLD-Framing/Rough-in2/18/20202/18/20202/18/2020PNR
DetailsDave Hannah
Sean Phone #: ###-####
BLD-Wall Bracing2/18/20202/18/20202/18/2020PPASS
DetailsDave Hannah
BLD-Foundation12/5/201912/5/201912/6/2019PPART
DetailsTony Young
concrete at 2 // Brandon Phone #: ###-####
BLD-Footing12/5/201912/5/201912/6/2019PPASS
DetailsTony Young
Brandon Phone #: ###-####
BLD-Footing12/4/201912/4/201912/5/2019PPASS
DetailsTony Young
Brandon Phone #: ###-####
BLD-Footing12/3/201912/4/201912/4/2019APEND
DetailsTony Young
Brandon Phone #: ###-####// needs hillside approval
BLD-Footing12/3/201912/3/201912/4/2019PPEND
DetailsTony Young
Brandon Phone #: ###-####,, ok pending soils approval