Permit Information
Permit NumberBLD19-03942
StatusFinaled
Name CONCAR INC
Site Address 1613 N RIDGECLIFF LN
Project Name1613 Ridgecliff
Customer Number 
ePlanReviewYes
Description
**W.U.I. FOOTHILLS ZONE A CLASS "A" ROOF AND NON-COMBUSTIBLE EXTERIOR SIDING REQUIRED** **PASSES USING UA TRADE OFF** Permit for the construction of a new 3776 sq. ft., two level (first story 2276 sq. ft., basement is 1500 sq. ft.) single family dwelling with 5 bedrooms, 3.5 bathrooms, approximately 1000 sq. ft. of covered patio/porch and a 1020 sq. ft. attached garage per the approved plans and any notations. R-1B zoning and setbacks per planning. JJN ***Sprinklers are required***LGM
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/30/20207/1/20207/1/2020APASS
DetailsBrandon Shaw
screened // Jeff Phone #: ###-####
DOC - Permit Finaled7/1/20207/1/20207/1/2020PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results7/1/20207/1/20207/1/2020ADONE
DetailsBrandon Shaw
ACH50- 3.3
BLD-Final6/26/20206/30/20206/30/2020PCANC
DetailsBrandon Shaw
Jeff *screened* Phone #: ###-####
BLD-Final6/25/20206/26/20206/26/2020ANR
DetailsMike Jordan
screened // Jeff Phone #: ###-####. Needs public works and zoning final?
BLD-Energy code compliance3/10/20203/11/20203/11/2020PPASS
DetailsBrandon Shaw
Jeff Phone #: ###-####
BLD-Energy code compliance3/2/20203/3/20203/3/2020PNR
DetailsBrandon Shaw
Need fire....
BLD-Energy code compliance2/20/20202/20/20202/20/2020PNR
DetailsBrandon Shaw
Jeff Phone #: ###-####
BLD-Framing/Rough-in2/12/20202/13/20202/13/2020PPASS
DetailsBrandon Shaw
Jeff Phone #: ###-####
BLD-Framing/Rough-in2/5/20202/6/20202/6/2020ANR
DetailsMike Jordan
Call to meet // Jeff Phone #: ###-####
BLD-Framing/Rough-in1/21/20201/21/20201/21/2020PFAIL
DetailsMike Jordan
Jeff Phone #: ###-####. Needs to remove tyvek for wall bracing inspection. Need to verify drag trusses on roof nailing. it is ok to spray ceiling roof deck with the 3 inches of closed cell spray insulation, install fir sprinklers. Will also need to complete foam seal prior to framing inspection..Also noted the the tung and groove material that is going to used on soffits requires Romeo Gervais or Ron Johnsons approval from the fire dpt.
BLD-Footing11/5/201911/6/201911/6/2019APART
DetailsBrandon Shaw
Work in progress...
BLD-Footing10/31/201911/1/201911/1/2019APASS
DetailsBrandon Shaw
South and East walls...
Work in progress...