**W.U.I. FOOTHILLS ZONE A CLASS "A" ROOF AND NON-COMBUSTIBLE EXTERIOR SIDING REQUIRED** **PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 4008 sq. ft., two story (first story 3114 sq. ft., second story 894 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 469 sq. ft. of covered patio/porch and a 1083 sq. ft. attached garage per the approved plans and any notations. R-1ADA zoning and setbacks per planning. JJN ***Sprinklers are required and are being provided, as noted on sheet A101***LGM

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/29/20207/29/20207/29/2020PPASS
DetailsBrandon Shaw
Brian- ###-####
DOC - Permit Finaled7/29/20207/29/20207/29/2020PPASS
DetailsBrandon Shaw
BLD-Conference7/28/20207/28/20207/28/2020PDONE
DetailsBrandon Shaw
Prefinal walk thru...
BLD-Energy code compliance3/30/20203/30/20203/30/2020PPASS
DetailsTell Riley
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch//windows ok//walls ok// ceiling has R38 batts visible, person onsite said r11 was installed above the r38//check insulation certificate at final for r49 in attic//crawl space insulation has not been insulated//
BLD-Framing/Rough-in3/26/20203/26/20203/26/2020PPASS
DetailsJim Storey
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch
BLD-Wall Bracing3/18/20203/18/20203/18/2020PPART
DetailsTell Riley
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch//ok other than a couple floor to floor straps-talked with framer//can check at framing//
BLD-Wall Bracing3/17/20203/17/20203/17/2020PFAIL
DetailsJim Storey
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch missing horr straps.
BLD-Foundation12/31/201912/31/201912/31/2019PPASS
DetailsDave Hannah
Thanks Eric Williams Phone #: ###-#### Inspection requested via web by bryan murdoch
BLD-Footing12/10/201912/11/201912/11/2019APASS
DetailsBrandon Shaw
Work in progress...