BLD-Final | 2/6/2020 | 2/6/2020 | 2/6/2020 | P | PASS |
Dave Hannah
|
|
|
Dustin Phone #: ###-####
|
FIRE-Final Inspection | 2/4/2020 | 2/5/2020 | 2/5/2020 | P | PASS |
Jim Page
|
|
|
Previously noted item for fire alarm correction complete, final life fire safety inspection for area of work complete, signatures provided on permit sign off card.
Justin Phone #: ###-####
|
BLD-Final | 1/31/2020 | 1/31/2020 | 2/3/2020 | P | PART |
Dave Hannah
|
|
|
Justin Phone #: ###-#### ok for tco ok for perm after fire gos perm
|
FIRE-Final Inspection | 1/31/2020 | 1/31/2020 | 1/31/2020 | P | PART |
Jim Page
|
|
|
Partial final inspection for life fire safety complete, a minor fire alarm modification was required, hotel fire panel is what provides notification to the fire alarms in area of work, fire alarm inspection for the 1 strobe addition will be completed on 05FEB2020. No fire sprinkler modifications, fire extinguishers are placed with current inspection tags. TCO authorized for 14 days per conversation with Joe Bruce, Fire Section Supervisor. After fire alarm inspection is inspected and finaled this permit can be signed off for life fire safety. Chest freezer will be relocated as discussed.
Justin Phone #: ###-####
|
BLD-Final | 1/27/2020 | 1/28/2020 | 1/28/2020 | P | NR |
Dave Hannah
|
|
|
Justin - call in advance Phone #: ###-####
|
FIRE-Final Inspection | 1/27/2020 | 1/28/2020 | 1/28/2020 | A | FAIL |
Jim Page
|
|
|
Provide fire alarm notification in waiter station area as discussed, any and all modifications to the fire alarm system will require a seperate permit. Relocate chest freezer that is blocking designated exit path from new kitchen opening into kitchen as discussed.
Justin - call in advance Phone #: ###-####
|
BLD-Framing/Rough-in | 1/6/2020 | 1/7/2020 | 1/7/2020 | A | PASS |
Dave Hannah
|
|
|
Justin Phone #: ###-####
|