Permit Information
Permit NumberBLD20-01287
StatusIssued
Name CBH HOMES
Site Address 11154 W USTICK RD
Project Name7-1 Ustick Cottages
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 912 sq. ft., two story (first story 480 sq. ft., second story 432 sq. ft.) single family dwelling with 2 bedrooms, 1.5 bathrooms, approximately 80 sq. ft. of covered patio/porch. All construction per the approved plans, local codes and any notations. Prescritive Energy Compliance. R-2D zoning and setbacks per planning. ***RDP***
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/12/20208/13/20208/13/2020ANR
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Blower Door Test Results8/13/20208/13/20208/13/2020ADONE
DetailsTell Riley
4.90 ACH 50
BLD-Other7/21/20207/22/20207/22/2020PPASS
DetailsTell Riley
Drywall soffits Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Other7/16/20207/17/20207/17/2020AFAIL
DetailsTell Riley
soffit sheetrock Phone #: ###-#### Inspection requested via web by Joel Hirtle//gable end projections within 3' of PL still need to be rated//
BLD-Other7/13/20207/13/20207/13/2020ANR
DetailsTell Riley
Soffit Sheetrock inspecion Phone #: ###-#### Inspection requested via web by Joel Hirtle//CN posted//all soffits within 3' of PL need to have 1 hr rating//
BLD-Energy code compliance7/7/20207/8/20207/8/2020APASS
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Framing/Rough-in7/7/20207/8/20207/8/2020APASS
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Joel Hirtle//corrections made//
BLD-Framing/Rough-in7/6/20207/6/20207/6/2020PPART
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Joel Hirtle//add truss bracing, provide engineering for drilled floor truss//add truss blocking//ok to insulate//
BLD-Wall Bracing6/25/20206/26/20206/26/2020PPASS
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Joel Hirtle//add HD nails in pt//staples were peing added onsite as we walked shear//
BLD-Wall Bracing6/24/20206/25/20206/25/2020ANR
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Foundation5/25/20205/26/20205/26/2020PPASS
DetailsTell Riley
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo aggregate constru
BLD-Footing5/21/20205/22/20205/22/2020APASS
DetailsDave Hannah
As early as possible Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo aggregate constru