Final | 7/10/2015 | 7/10/2015 | 7/10/2015 | P | PASS |
Eric Story
|
|
|
Inspect- Inside/outside garage addition; 2nd floor deck- outside lights ; outlet.
Thank you Phone #: ###-#### Inspection requested via web by Lonnie Sorichta final ok
|
Electrical Rough-In | 6/14/2015 | 6/15/2015 | 6/15/2015 | A | PASS |
Eric Story
|
|
|
Inspection for cover; Back of house, second floor deck. Builders are going to take out window/install new doorway onto deck. Siding is removed. Homeowner will be there. His name is Jim /
Inspect: Re-routed wires, added 2 exterior light, 1 switch, 1 outside outlet, 1 inside outlet for layout. Thank you, Lonnie Phone #: ###-#### Inspection requested via web by Lonnie Sorichta back patio off master rough-in ok cover
|
Electrical Rough-In | 5/6/2015 | 5/7/2015 | 5/7/2015 | P | PASS |
Rex Boyles
|
|
|
Garage Addition - inspect for cover, inspect sub-panel fed from main panel, inspect exterior house garage lights, inspect 3-way switching from new garage to house. Thank you Phone #: ###-#### Inspection requested via web by Lonnie Sorichta r/i garage and three way switching and sub panel ok
|
Electrical Rough-In | 4/20/2015 | 4/21/2015 | 4/21/2015 | A | PASS |
Daryl DeGrange
|
|
|
Decided to put 2+ inches of concrete on top of PVC (2 locations) , instead of an 18" trench. Inspect- PVC in trench waiting for concrete, installation on GFI outlet under panel. Box and pipes will be supported after new siding is installed. Thank you Phone #: ###-#### Inspection requested via web by Lonnie Sorichta rough-in ok cover conduit to shed (2in. concrete) exsisting1/2 PVC at 6in dept
|
Electrical Rough-In | 4/19/2015 | 4/20/2015 | 4/20/2015 | A | PART |
Daryl DeGrange
|
|
|
Inspect underground for cover; 1-1 1\4, 1-3\4, and 1-1\2 existing PVC. Conference Phone #: ###-#### Inspection requested via web by Lonnie Sorichta rough-in ok cover conduits under slab only
|