Final | 7/2/2015 | 7/2/2015 | 7/2/2015 | P | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Kendra Lanham garage final ok
|
Final | 6/30/2015 | 6/30/2015 | 6/30/2015 | P | CANC |
Rock A. Hudson
|
|
|
Request for inspection for ID Power to connect power to the panel. Wiring from meter to main panel will need to be done while ID Power disconnects the temp service, due to the heat load. **Please call the office for clarification** Phone #: ###-#### Inspection requested via web by Kendra Lanham Needed permenant service inspection.
|
Permanent Service | 6/30/2015 | 6/30/2015 | 6/30/2015 | P | PASS |
Rock A. Hudson
|
|
|
Request for inspection for ID Power to connect power to the panel. Wiring from meter to main panel will need to be done while ID Power disconnects the temp service, due to the heat load. **Please call the office for clarification** Phone #: ###-#### Inspection requested via web by Kendra Lanham Due to excessive heat contractor to make interior connection so house will be out of power for minimal time. Grounding electode system to be replaced by final due to rebar exposed to weather. p/s u/g rec ok
|
Electrical Rough-In | 6/24/2015 | 6/25/2015 | 6/25/2015 | A | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### Inspection requested via web by Kendra Lanham rough-in ok cover garage
|