ELE-Aging Inspection | 2/15/2019 | 2/15/2019 | 2/15/2019 | | PASS |
Rock A. Hudson
|
|
|
Texted contractor who went right to job andsent photos of wiring. Violation is no longer a violation due to changes to ordinance.
|
Final | 2/15/2019 | 2/15/2019 | 2/15/2019 | P | PASS |
Rock A. Hudson
|
|
|
Final ok
|
Electrical Rough-In | 7/7/2015 | 7/8/2015 | 7/8/2015 | A | FAIL |
Rex Boyles
|
|
|
Added 2 240v 30 amp circuits for mini splits. Final needed. Phone #: ###-#### Inspection requested via web by Stuart Welton No mechanical permit, electrical work to be performed by licensed electrical contractor(wiring between heat pump and air handeler) NEC340.12(9)(10)- type UF cable not permitted in commercial building
|