ELE-Aging Inspection | 3/31/2020 | 3/31/2020 | 3/31/2020 | | PASS |
Daryl DeGrange
|
|
|
see final
|
Final | 3/31/2020 | 3/31/2020 | 3/31/2020 | A | PASS |
Daryl DeGrange
|
|
|
Job complete, final ok
|
ELE-Aging Inspection | 12/31/2019 | 12/31/2019 | 12/31/2019 | | DONE |
Mark Moncarr
|
|
|
Called and left message on 12/31 about the need for a final inspection. If solar was installed, we will need 1 each components to verify UL listing.
|
ELE-Aging Inspection | 10/1/2019 | 10/1/2019 | 10/1/2019 | | FAIL |
Mark Moncarr
|
|
|
3rd attempt of contact. Need 1 each of components installed. Schedule a final inspection. Additional fees will apply.
|
ELE-Aging Inspection | 7/2/2019 | 7/2/2019 | 7/3/2019 | | DONE |
Mark Moncarr
|
|
|
Please schedule a final inspection.
|
ELE-Aging Inspection | 4/2/2019 | 4/2/2019 | 4/2/2019 | | DONE |
Mark Moncarr
|
|
|
Sent a message on 4/2/19 to coordinate a time for a final inspection.
|
Electrical Rough-In | 1/31/2017 | 1/31/2017 | 1/31/2017 | P | DONE |
Mark Moncarr
|
|
|
new player for Altenergy. Robert ###-#### Phone #: ###-#### Inspection requested via web by Andy Derrick Called in for RI, job is already finished. Inspection is called for tomorrow 2/1/17 for a final
|