Final | 5/30/2018 | 5/31/2018 | 5/31/2018 | A | PASS |
Eric Story
|
|
|
Lower Level inspection all areas Contact Scott Wilson. Thank you, Phone #: ###-#### Inspection requested via web by Tom Betty Final occ card signed, Final ok
|
Final | 5/29/2018 | 5/30/2018 | 5/30/2018 | P | PART |
Eric Story
|
|
|
Lower Level all areas final inspection. Contact Scott Wilson. Thank you, Phone #: ###-#### Inspection requested via web by Tom Betty Temp occ card signed waitng for main final for 5/31/18 if all plates and panic hard ware installed
|
Conference | 5/9/2018 | 5/9/2018 | 5/9/2018 | A | DONE |
Eric Story
|
|
|
Installation of a fireplace outside. Phone #: ###-#### Inspection requested via web by Scott Wilson Discussed GFCI protection of fire place on patio with cord and plug type.
|
Final | 5/7/2018 | 5/7/2018 | 5/7/2018 | A | PART |
Eric Story
|
|
|
Finals in Units: 100, 101, 102, 103, 104, 105, 106 200, 201, 202, 203, 204, 205, 206 Phone #: ###-#### Inspection requested via web by Scott Wilson All remaining units checked out fine
|
Final | 5/4/2018 | 5/4/2018 | 5/4/2018 | A | PART |
Eric Story
|
|
|
Unit finals in 300, 301, 302, 303, 304, 305, 306 401, 402, 403, 404, 405, 406 All of the corridors on 3rd and 4th floors Phone #: ###-#### Inspection requested via web by Scott Wilson Units as requested ok and corridors as well
|
Final | 5/1/2018 | 5/2/2018 | 5/2/2018 | A | CANC |
Eric Story
|
|
|
Trash Room (ground level) Electrical/ Riser Room dividing wall Contact Scott Wilson Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Needed r/i
|
Electrical Rough-In | 5/2/2018 | 5/2/2018 | 5/2/2018 | P | PASS |
Eric Story
|
|
|
Trash Room (ground level) Electrical/ Riser Room dividing wall Contact Scott Wilson Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek TRash room and demising wall plus u/g for gate ok to cover
|
Final | 4/27/2018 | 4/27/2018 | 4/27/2018 | P | PART |
Eric Story
|
|
|
Final for Roofs Contact Scott Wilson Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Roof top units installation ok
|
Final | 4/26/2018 | 4/26/2018 | 4/26/2018 | A | PART |
Eric Story
|
|
|
Unit finals for 420, 423, 425, 432 and Rough in for cover Lobby Fireplace Contact Scott Wilson Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Units as requested all checked out fine and are ok
|
Final | 4/25/2018 | 4/25/2018 | 4/25/2018 | P | PART |
Eric Story
|
|
|
Unit finals in 320, 322, 323, 324, 325, 326, 328, 330, 332 Janitor closets 206, 306, 406 Contact Scott Wilson Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Units as requested checked out fine and are ok
|
Final | 4/24/2018 | 4/24/2018 | 4/24/2018 | A | PART |
Eric Story
|
|
|
Unit finals in 220,222, 223, 224, 225, 226, 228, 230, 232. Comm Rm. 207, Janitor Rm. 206 Phone #: ###-#### Inspection requested via web by Cathy Duchek Rooms as noted checked out and are ok
|
Final | 4/23/2018 | 4/23/2018 | 4/23/2018 | P | PART |
Eric Story
|
|
|
Unit finals in 120, 122, 123, 124, 125, 126, 128, 130 and 132 Contact Scott Wilson Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Units as requested ok
|
Final | 4/19/2018 | 4/19/2018 | 4/19/2018 | P | PART |
James Ady
|
|
|
1st floor corridor, Rm. 106, 107, 108 and 2nd floor corridor, Rm. 207, 208 Contact Scott Wilson Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek 1st floor corridor Storage rm 106, com rm 107 Trash rm 108, 2nd floor corridor, com rm 207 trash rm 208. Final ok
|
Final | 4/18/2018 | 4/18/2018 | 4/18/2018 | A | NH |
Rock A. Hudson
|
|
|
Final for Units 120, 122, 123, 124, 125, 126, 128, 130, 132 Contact Scott Wilson Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Called contact, no answer, left message to recall when someone is available
|
Electrical Rough-In | 3/30/2018 | 3/30/2018 | 3/30/2018 | P | PASS |
Eric Story
|
|
|
Ceiling rough in for cover on ground level Interior space. Heat trace in garage. Contact Scott Wilson Phone #: ###-#### Inspection requested via web by Cathy Duchek Ok to cover areas as noted on print and heat trace in east side
|
Final | 3/26/2018 | 3/27/2018 | 3/27/2018 | A | PART |
Eric Story
|
|
|
Finals for Units 107, 110, 207, 210, 307, 310, 407, 410 (Unit Appliance) Ceiling rough in for cover in garage soffit, Fitness, Lounge, (1/2) corridor, public bathrooms, Quiet Rooms, Janitor closet and hallway. Contact Scott Wilson. Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Units as noted on print checked out fine
|
Electrical Rough-In | 3/27/2018 | 3/27/2018 | 3/27/2018 | P | PASS |
Eric Story
|
|
|
Finals for Units 107, 110, 207, 210, 307, 310, 407, 410 (Unit Appliance) Ceiling rough in for cover in garage soffit, Fitness, Lounge, (1/2) corridor, public bathrooms, Quiet Rooms, Janitor closet and hallway. Contact Scott Wilson. Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Areas as noted on print ok to cover ceilings
|
Final | 3/21/2018 | 3/22/2018 | 3/22/2018 | A | PART |
Eric Story
|
|
|
Units 116, 118, 216, 218, 316, 318, 416, 418 Heat trace in garage area. Contact Scott Wilson Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Rooms marked on print checked out fine and are ok
|
Electrical Rough-In | 3/22/2018 | 3/22/2018 | 3/22/2018 | P | PASS |
Eric Story
|
|
|
4th Floor Comm. Rm. rough in for cover. Phone #: ###-#### Inspection requested via web by Scott Wilson 4th Floor as noted on print ok to cover walls and ceilings
|
Final | 3/20/2018 | 3/20/2018 | 3/20/2018 | A | PART |
Eric Story
|
|
|
Final for Units 308, 309, 311, 312, 314, 408, 409, 411, 412, 414 Contact Scott Wilson Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Units as marked on print checked out fine
|
Final | 3/19/2018 | 3/19/2018 | 3/19/2018 | P | PART |
Eric Story
|
|
|
Units 208, 209, 211, 212, 214 Contact Scott Wilson Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Areas as noted on print units checked out fine
|
Final | 3/16/2018 | 3/16/2018 | 3/16/2018 | P | PASS |
Eric Story
|
|
|
Finals for Units 108, 109, 111, 112,114 Partial rough in ceiling inspection for cover in garage. Phone #: ###-#### Inspection requested via web by Scott Wilson Areas as noted on print ok to cover and rooms as noted all checked out and mark on print.
|
Final | 3/16/2018 | 3/16/2018 | 3/16/2018 | P | FAIL |
Eric Story
|
|
|
Finals for Units 108, 109, 111, 112,114 Partial rough in ceiling inspection for cover in garage. Phone #: ###-#### Inspection requested via web by Scott Wilson Appliance company is installing cords on ranges and dryers Gave a warning to GC and company about not doing this any more
|
Electrical Rough-In | 3/6/2018 | 3/7/2018 | 3/7/2018 | A | PASS |
Eric Story
|
|
|
Walls only in Lounge and Fitness areas for cover Contact Scott Wilson Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Walls in fitness as noted on printed ok to cover
|
Electrical Rough-In | 3/1/2018 | 3/2/2018 | 3/2/2018 | P | PASS |
Eric Story
|
|
|
Rough in for cover in 4th floor corridors Contact Scott Wilson Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Corridor as marked on print ok to cover
|
Electrical Rough-In | 2/28/2018 | 2/28/2018 | 2/28/2018 | A | PASS |
Eric Story
|
|
|
1st, 2nd, 3rd corridor and South Electrical, Riser Rooms for cover. Contact Scott Wilson Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Corridors riser room walls ok to cover
|
Electrical Rough-In | 2/26/2018 | 2/27/2018 | 2/27/2018 | A | PASS |
Eric Story
|
|
|
Rough In for Cover Ground level area from the stairs to the east part of the building. Contact Scott Wilson Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Area as noted on print walls only in ground floor ok to cover
|
Electrical Rough-In | 2/23/2018 | 2/23/2018 | 2/23/2018 | P | PASS |
Eric Story
|
|
|
Units 100, 101, 102, 103, 104, 105, 106 soffits for cover Contact Scott Wilson Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Hard lids as noted on print ok to cover
|
Electrical Rough-In | 2/20/2018 | 2/20/2018 | 2/20/2018 | P | PASS |
James Ady
|
|
|
Rough in Units 200, 201, 202, 203, 204, 205, 206, 300 soffits for cover Contact Scott Wilson Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Soffits only ok to cover
|
Electrical Rough-In | 2/19/2018 | 2/20/2018 | 2/20/2018 | A | CANC |
Eric Story
|
|
|
Rough-In Units 100, 101, 102, 103, 104, 105, 106 soffits for cover Contact Scott Wilson Thank you, Phone #: ###-#### >> Inspection requested via web by Cathy Duchek Inspection cancelled from web by: Cathy Duchek
|
Electrical Rough-In | 2/15/2018 | 2/15/2018 | 2/15/2018 | A | PASS |
Eric Story
|
|
|
Rough-In for Cover Units 301, 302, 303, 304, 305, 306 soffits Area 2 and 3 corridor ceilings on floors 1-3 Contact Scott Wilson Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Units and corridors as marked on print for hard lids ok to cover
|
Permanent Service | 2/14/2018 | 2/14/2018 | 2/14/2018 | P | PASS |
Eric Story
|
|
|
Main gear and branch panels Contact Scott Wilson Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek p/s u/g n ok Emails saved for availiable fault calc 25,009 amp max in rush from IPCO and breaker is 65K rated
|
Electrical Rough-In | 2/12/2018 | 2/13/2018 | 2/13/2018 | P | PASS |
Eric Story
|
|
|
Inspection for cover: Fire Smoke dampers in the northwest corner on floors 1, 2, 3 Unit 401, 402, 403, 404, 405, 406 soffits Wall in front of elevator on 4th floor Contact Scott Wilson Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Areas as noted on print ok to cover
|
Electrical Rough-In | 2/8/2018 | 2/8/2018 | 2/8/2018 | P | PASS |
Eric Story
|
|
|
Rough-In for cover Units 420, 423, 425, 432 soffits. Contact Scott Wilson Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Areas as noted on print ok to cover
|
Electrical Rough-In | 2/7/2018 | 2/7/2018 | 2/7/2018 | P | PASS |
Eric Story
|
|
|
Inspection for cover: Janitors Closets on floors 1-4, 4th floor corridor, Unit 402 east wall, Unit 320 soffits, 1st floor fire damper Phone #: ###-#### Inspection requested via web by Scott Wilson Areas as noted on print ok to cover. Talked about lockable disc for dampers in hallways as per 110.25
|
Electrical Rough-In | 2/1/2018 | 2/1/2018 | 2/1/2018 | P | PASS |
Eric Story
|
|
|
Inspection for cover in Units 232, 322, 323, 324, 325, 326, 328, 330, 332 Soffits and the North Stairs. Contact Scott Wilson Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Areas as noted on print hard lids and north stair ok to cover
|
Electrical Rough-In | 2/1/2018 | 2/1/2018 | 2/1/2018 | P | CANC |
Eric Story
|
|
|
Inspection for cover in Units 232, 322, 323, 324, 325, 326, 328, 330, 332 Soffits Contact Scott Wilson Thank you Phone #: ###-#### >> Inspection requested via web by Cathy Duchek Inspection cancelled from web by: Cathy Duchek
|
Electrical Rough-In | 1/29/2018 | 1/29/2018 | 1/29/2018 | P | PASS |
Eric Story
|
|
|
Units 130 and 132 soffits for cover inspection. Elevator consultation also. Contact Scott Wilson Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Units as descibed ok to cover hardd lids
|
Electrical Rough-In | 1/25/2018 | 1/25/2018 | 1/25/2018 | P | PASS |
Eric Story
|
|
|
Units 216, 218, 220, 222, 223, 224, 225, 226, 228, 230 soffits for cover. Contact Scott Wilson Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Units as noted on print ok to cover hard lids
|
Electrical Rough-In | 1/23/2018 | 1/24/2018 | 1/24/2018 | A | PASS |
Eric Story
|
|
|
Units 123, 124, 125, 126,128 soffits and 1st floor corridor 105 Contact Scott Wilson Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Areas as noted on print and inspection request ok to cover
|
Electrical Rough-In | 1/19/2018 | 1/19/2018 | 1/19/2018 | A | PASS |
Eric Story
|
|
|
Units 302, 303, 304, 305, 306, 402, 403, 404, 405, 406 for cover Unit 122 soffit for cover Contact Scott Wilson Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Units as noted on print walls and hard lids ok to cover
|
Electrical Rough-In | 1/18/2018 | 1/18/2018 | 1/18/2018 | P | PASS |
Eric Story
|
|
|
Rough-In for cover for Units 116, 118 and 120 soffits Contact Scott Wilson Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Units as requested and marked on print ok to cover drop ceilings
|
Electrical Rough-In | 1/10/2018 | 1/10/2018 | 1/10/2018 | P | PASS |
Eric Story
|
|
|
Rough-in for cover: 2nd (205) and 3rd (305) floor corridor walls in area 1 4th (402) floor corridor in area 2 Contact Scott Wilson. Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Corridors as marked on print ok to cover walls only
|
Electrical Rough-In | 1/9/2018 | 1/9/2018 | 1/9/2018 | P | PASS |
Eric Story
|
|
|
Inspection for cover in: Units: 102, 103, 104, 105, 106, 202, 203, 204, 205, 206 Soffits: Units 407, 408, 409, 410, 411, 412, 414, 416, 418 Contact Scott Wilson Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Rooms as noted on print ok to cover
|
Electrical Rough-In | 1/3/2018 | 1/4/2018 | 1/4/2018 | A | PASS |
Eric Story
|
|
|
Inspection for cover Units 100, 200, 101, 201, 203, 204, 132, 232, 332, 432. Contact Scott Wilson. Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Units as noted on print and inspection request ok to cover
|
Electrical Rough-In | 12/28/2017 | 12/28/2017 | 12/28/2017 | A | PASS |
Eric Story
|
|
|
3rd floor soffits in units - 307, 308, 309, 310, 311, 312, 314, 316, 318 Phone #: ###-#### Inspection requested via web by Scott Wilson Areas as noted on print drop ceilings ok to cover
|
Electrical Rough-In | 12/27/2017 | 12/27/2017 | 12/27/2017 | P | PASS |
Eric Story
|
|
|
Room 333 hard lids and walls only ok to cover
|
Electrical Rough-In | 12/19/2017 | 12/19/2017 | 12/19/2017 | A | PASS |
Eric Story
|
|
|
Inspection for cover – Units 125, 225, 325, 130, 230, 330 Trash Rooms – Levels 1-4 Mechanical Rooms – Levels 1-3 East (Oakland Rd.) Corridor Levels 1-3 Contact Scott Wilson Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Areas as noted on print and inspection request ok to cover
|
Electrical Rough-In | 12/6/2017 | 12/6/2017 | 12/6/2017 | P | PASS |
Eric Story
|
|
|
Rough-in inspection for cover in Units 320, 322, 323, 324, 326, 328, 420, 423 Contact Scott Wilson Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Areas as noted on inspection request and noted on prints ok to cover
|
Electrical Rough-In | 11/30/2017 | 12/1/2017 | 12/1/2017 | A | PASS |
Eric Story
|
|
|
Rough-In inspection for cover in Units 207, 208, 209, 210, 211, 212, 214 soffits. Contact Scott Wilson Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Areas as noted on print, Hard lids ok to cover
|
Electrical Rough-In | 11/27/2017 | 11/28/2017 | 11/28/2017 | A | PASS |
Eric Story
|
|
|
Rough-in inspection for Units 120, 122, 123, 124, 126, 128, 220, 222, 223, 224, 226 and 228 for cover. Also needed is an elevator consultation. Contact Scott Wilson. Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Areas as noted on inspection request walls and hard lids only ok to cover. Discussed location of elevator disc and shunt trip ,advised contractor to call state of ID for approval of locations as he wants to locate panels......
|
Conference | 11/22/2017 | 11/22/2017 | 11/22/2017 | A | DONE |
Eric Story
|
|
|
Contact Scott Wilson. Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Discussed M/C feeders ran close to each other, No derated required for they are in there own raceway...
|
Electrical Rough-In | 11/16/2017 | 11/17/2017 | 11/17/2017 | A | PASS |
Eric Story
|
|
|
Inspection for Unit 111 and Stairwell #2 (south stairs) Contact Scott Wilson. Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Unit 111 hard lids in kitchen and baths and stair #2 on south side walls only ok to cover
|
Electrical Rough-In | 11/15/2017 | 11/16/2017 | 11/16/2017 | A | PART |
Rock A. Hudson
|
|
|
Rough in for Cover 1st floor soffit in Units 107, 108, 109, 110, 111, 112, 114. 4th floor corridor, Area 3 Contact Scott Wilson Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek 111 not ready, 107 thru 110, 112, 114 drop lids and 4th floor corridor walls only rough in ok cover
|
Electrical Rough-In | 11/8/2017 | 11/9/2017 | 11/9/2017 | A | PASS |
Eric Story
|
|
|
Rough-In inspection for cover in Area 3; 1st, 2nd and 3rd floor corridors. Contact Scott Wilson. Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek 1st floor 2nd floor 3rd floor corridor walls only ok to cover as marked on print. Discussed wiring of elevator install, will need to get approved plans and location of shunt trip breaker and disc for motors.
|
Electrical Rough-In | 11/2/2017 | 11/2/2017 | 11/2/2017 | P | PASS |
Eric Story
|
|
|
Rough-in for cover in units 116, 118, 216, 218, 316, 318, 416 and 418 Contact Scott Wilson Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Units 118,116,216,218,316,318,416,418 hard lids and walls only ok to cover
|
Electrical Rough-In | 11/2/2017 | 11/2/2017 | 11/2/2017 | P | FAIL |
Eric Story
|
|
|
Rough-in for cover in units 116, 118, 216, 218, 316, 318, 416 and 418 Contact Scott Wilson Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Discussed removing of insulation installed proir to inspection will have it removed.
|
Electrical Rough-In | 10/23/2017 | 10/24/2017 | 10/24/2017 | A | PASS |
Eric Story
|
|
|
Area 3, floors 3 ; 4, rough in for cover Contact Scott Wilson 208###-#### Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Units 311,309,310,308,312,314-411,409,407,408,410,412,414 hard lids and walls ok to cover
|
Electrical Rough-In | 10/20/2017 | 10/20/2017 | 10/20/2017 | P | CANC |
Eric Story
|
|
|
“3rd floor, Area 3; rough in for cover”, Units 307, 308, 309, 310, 311, 312 and 314 Contact Scott Wilson Thank you, Phone #: ###-#### >> Inspection requested via web by Cathy Duchek Inspection cancelled from web by: Cathy Duchek
|
Electrical Rough-In | 10/20/2017 | 10/20/2017 | 10/20/2017 | A | CANC |
Eric Story
|
|
|
“3rd floor, Area 3; rough in for cover”, Units 307, 308, 309, 310, 311, 312 and 314 Contact Scott Wilson Thank you Phone #: ###-#### >> Inspection requested via web by Cathy Duchek Inspection cancelled from web by: Cathy Duchek
|
Rough-In Permanent Service | 10/11/2017 | 10/12/2017 | 10/12/2017 | A | PASS |
Daryl DeGrange
|
|
|
Rough In inspection for Units 107-108-109-110-111-112-114-207-208-209-210-211-212-214. First ; second floor halls. Contact John McElroy ###-#### Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek No service inspection- Rough-in ok cover walls and hard lids
|
Conference | 10/4/2017 | 10/4/2017 | 10/4/2017 | P | DONE |
Eric Story
|
|
|
Consult Contact Scott Wilson. Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Verified windows and was told roofing material is in place to keep moisture from entering building to protect romex cable, ok to proceed pulliong wire on west end of building
|
Electrical Rough-In | 9/18/2017 | 9/18/2017 | 9/18/2017 | A | PASS |
Eric Story
|
|
|
Ufer ground inspection. Contact Scott Wilson. Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Concrete encased electrode ok to cover
|
Conference | 9/12/2017 | 9/12/2017 | 9/12/2017 | P | DONE |
Eric Story
|
|
|
Consult for booster pump location Contact Scott Wilson Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Discussed moving of fire pump, told them they would need to get it approved per Fire Marshall/Fire Inspector/ and City of Boise. Will not make that call if it ok to move pumps around, If all NEC working clearences are in place pump may stay in place....
|
Electrical Rough-In | 9/8/2017 | 9/8/2017 | 9/8/2017 | P | PASS |
Eric Story
|
|
|
Underground Phone #: ###-#### Inspection requested via web by Scott Wilson u/g fo feeders ok to cover
|
Electrical Rough-In | 8/24/2017 | 8/24/2017 | 8/24/2017 | P | PASS |
Eric Story
|
|
|
Ground Inspection Contact Scott Wilson Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek u/g for lobby ok to cover
|
Electrical Rough-In | 8/10/2017 | 8/10/2017 | 8/10/2017 | P | PASS |
Eric Story
|
|
|
Underground inspection for Identity Student Housing. Contact Scott Wilson. Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek u/g for feeders part 2 ok cover
|
Electrical Rough-In | 8/8/2017 | 8/8/2017 | 8/8/2017 | P | PASS |
Eric Story
|
|
|
Underground Inspection for Identity Student Housing Contact Scott Wilson Thank you. Phone #: ###-#### Inspection requested via web by Cathy Duchek Phase 1 u/g for feeders in parking garage ok cover
|
Conference | 8/1/2017 | 8/1/2017 | 8/1/2017 | P | PASS |
Eric Story
|
|
|
Contact Scott Wilson. Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Discussed layout of receptacles in rooms and wall spacing requirements, will address spacing in ADA rooms with fixed window panels that will not meet 210.52 wall spacing for 12' ......
|
Conference | 7/20/2017 | 7/20/2017 | 7/20/2017 | A | DONE |
Eric Story
|
|
|
Consultation at Identity Student Housing. Contact Scott Wilson. Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Discussed using vaults in electrical room for bending radius and conduits, fused and unfused shall not be in same raceway. Also talked about running romex prior to roof being in place, will omly install when 2 floors above have been framed and precaution will be made to insure wire does not get wet, ESI will send a email saying how they will prevent any water damage from saturating wires and if so romex will be replaced as needed....
|
Electrical Rough-In | 7/13/2017 | 7/13/2017 | 7/13/2017 | A | PASS |
Eric Story
|
|
|
Underground Inspection Contact Scott Wilson Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek u/g ok cover
|
Electrical Rough-In | 7/6/2017 | 7/6/2017 | 7/6/2017 | P | PASS |
Eric Story
|
|
|
Underground Inspection Contact Scott Wilson Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Electrical room under good, plenty of depth for next stage of runs before plumber comes, pictures ok at this time.
|
Electrical Rough-In | 6/22/2017 | 6/22/2017 | 6/22/2017 | P | PASS |
Mark Moncarr
|
|
|
Uffer ground inspection on 2nd floor deck. Contact Scott Wilson Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Ok cover ufer. 800.100(A)(3), #6 cu was used for GEC.
|
Electrical Rough-In | 5/23/2017 | 5/23/2017 | 5/23/2017 | P | PASS |
James Ady
|
|
|
Ufer ground. Starting underground conduit. Phone #: ###-#### Inspection requested via web by Scott Wilson UFER ok, Underground from vault to first stem wall ok to cover
|
Conference | 5/8/2017 | 5/9/2017 | 5/9/2017 | A | CANC |
Eric Story
|
|
|
Consultation for Identity Student Housing. Contact Scott Wilson. Thank you. Phone #: ###-#### Inspection requested via web by Cathy Duchek Scheduled for wrong day
|
Electrical Rough-In | 4/11/2017 | 4/12/2017 | 4/12/2017 | A | PART |
Eric Story
|
|
|
Uffer ground inspection. Contact Tom Betty Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Uffer ok cover
|