Information based on query as of Wednesday, May 15, 2024.
Permit Information
Permit NumberELE17-01337
StatusFinaled
Name ENTERPRISE ELECTRIC
Site Address 348 S 13TH ST
Project NameBoise Hilton Garden Inn
Customer Number 
ePlanReviewNo
Description
New: all electrical work for new project
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final9/11/20189/12/20189/12/2018APASS
DetailsRock A. Hudson
Rescheduled final inspection. Contact is Rick Badley. If possible please notify Rick 30 minutes prior to arriving on site. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate Final ok
Final9/7/20189/10/20189/10/2018ACANC
DetailsJames Ady
Requesting final inspection on the Hilton hotel. Please try to provide advanced notice of when you can be on site for scheduling purposes. Contact is Rick Badley. Phone #: ###-#### Inspection requested via web by Clint Tate will reschedule for 9/12/18
Final7/16/20187/16/20187/16/2018PPART
DetailsRock A. Hudson
Floor boxes, pool equipment room, and lock-offs. Phone #: ###-#### Inspection requested via web by Clint Tate Items left are pool bond shall connect to panel board, flag pole lights not in. Wiring removed for flag pole lights.
Phase 2 TCO ok
Final7/11/20187/12/20187/12/2018PPART
DetailsRock A. Hudson
Partial final for bar, kitchen, lighting in meeting room, floor boxes. Phone #: ###-#### Inspection requested via web by Clint Tate
Bar not ready receptacles on outside of bar show hot and ground reverse.
Pool bonding not complete.
Pool GFCI protection for pumps not done.
Carpet areas still to cover floor receptacles.
Upper level lockouts for HVAC units in rooms not complete.
Flag pole lights not complete.
Items completed- Kitchen panel covers installed complete, Kitchen circuit directory complete, GFCI protection complete for refrigerators in kitchen areas, Motion sensors over ridden in panel locations.
TCO for kitchen and meeting room OK
Final7/9/20187/10/20187/10/2018AFAIL
DetailsRock A. Hudson
Requesting final for laundry room and pool room. Also want to review Headwaters request to achieve C of O by this Friday July 13th. Phone #: ###-#### Inspection requested via web by Clint Tate
680.21(C)- Outlets supplying pumps 120 volt thru 240 volt shall have GFCI protection.
680.26(B)- Equipment bonds shall be connected with a #8 solid conductor bare or insulated. Stranded used.
* For Final inspection for all wiring associated with permit shall be complete as per manufacturers instructions and listing for equipment used.
Items yet to complete- Corrections for pool equipment, Flag pole lights, GFCI protection for kitchen refrigerators, Panel cover for panels in kitchen shall operate properly, Illumination around panel boards in kitchen and break rooms shall not be by automatic means, Bar GFCI protection for receptacles, Floor receptacles shall be complete.
Final7/10/20187/10/20187/10/2018PPART
DetailsRock A. Hudson
Requesting final for laundry room and pool room. Also want to review Headwaters request to achieve C of O by this Friday July 13th. Phone #: ###-#### Inspection requested via web by Clint Tate
TCO laundry room only ok
Final6/25/20186/25/20186/25/2018PPART
DetailsRock A. Hudson
Guest rooms on floor 1 not ready, Laundry equipment not wired but in place wiring blanked off, level 1 west baths vanities blanked off, Floor receptacles thru out level 1 blanked off. Signed TCO phase 1 only. Phase 1 and guest rooms levels 2 thru 5 TCO ok
Final6/21/20186/22/20186/22/2018APART
DetailsRock A. Hudson
Partial final, LVL 1. Phone #: ###-#### Inspection requested via web by Clint Tate Meeting rm, board rm, prefunction rm, Buffet wall, kitchen storage rms, west restrooms, meeting rm offices, employee lounge walls, server rm, work area rms, employee lounge bathroom, house keeping, linen rm, general managers office, reception area, ice rm, fitness rm, guest laundry. Areas listed above OK.
Still to complete- TV wall to fir out near reception area, guest laundry dryer receptacles, laundry equipment not ready, front vestibule door power to terminate, arc flash labels, employee lounge door power whips above grid, Kitchen panel doors will not close completely, kitchen refer GFCI device shall be below 6'7", 1 refer not gFCI protected, Kitchen ice maker not complete, Kitchen dishwasher disconnect not readily accessible lock out to be installed, seal electrical penetrations in all coolers and freezers, buffet warming pads not done listing OK, bar area not ready, floor receptacles through out not complete, pool and equipment not complete, HVAC for meeting rm not done, misc landscape not done,
Unable to sign TCO until revised TCO list is apprived from city.
Electrical Rough-In6/15/20186/18/20186/18/2018APASS
DetailsRock A. Hudson
We are requesting a rough-in inspection for reception and a final for under counter at bar for Monday morning. Our contact is Rick @ ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate
Areas noted with addition of kitchen grid, checked generator main bond checked.
Electrical Rough-In6/15/20186/15/20186/15/2018PNR
DetailsRock A. Hudson
Reception area Phone #: ###-#### Inspection requested via web by Clint Tate Will recall when ready
Final6/15/20186/15/20186/15/2018PPART
DetailsRock A. Hudson
Work room, manager''s office, pool ; spa, kitchen storage room, kitchen office, break room/mechanical room, 2 offices near meeting room. Phone #: ###-#### Inspection requested via web by Clint Tate
Guest laundry NR, Shall move motion in kitchen storage from behind door so operates. checked perimeter walls in pool area and sundeck, other areas listed checked ok electricly.
Areas noted
Final6/13/20186/13/20186/13/2018PPART
DetailsRock A. Hudson
2nd ; 3rd floors. Phone #: ###-#### Inspection requested via web by Clint Tate Guest rooms levels 2 thru 5 all tested OK
Conference6/12/20186/12/20186/12/2018PDONE
DetailsRock A. Hudson
TCO meeting items to complete.
Roof HVAC fuses- M3 35,37- 25a max, M3 34,35-55a max, M3 38,40- 25a max, M1 20,22,24- 50a max.
Level 5- 518 bath lighting,
Level 4- 419 bath lighting,
Level 3- 328 not ready, check misc receptacles at coffee bars for spark rings. 325 coffee bar not done.
Level 2- 212, 214, 218, 222, 224, 228 not ready. 217 switched power.
Level 1- Kitchen area incomplete, not tested, lobby area misc open wiring coffee bar, bar area not done, pool area and equipment not done, east HVAC not complete, west stair lighting not done, guest rooms not done, electrical room open boxes, gutters, labels incomplete. Lockout HVAC units in all rooms due to receptacle located behind cover screwed in place. Front landscape not complete, open wiring in misc conduits. Check elevator car lighting over current devices are 15 amp. Meeting room and corridor not tested. Confirm EPD devices for heat tape level 2 roof.
Electrical Rough-In6/8/20186/11/20186/11/2018APART
DetailsRock A. Hudson
All drop ceilings 1st floor except kitchen - rough
Roof - final
2nd Floor - Partial final Phone #: ###-#### Inspection requested via web by Clint Tate
Guest laundry flexible cords above grid. Work areas 2 rms, laundry areas, meeting rm, managers offices, fitness rm, ice rm grid rough in ok cover
Roof- M-3 35, 37 25 amp max, 34, 36 55 amp max, 38, 40 25 amp max
M-1 20, 22, 24 50 amp max.
Level 2- 212, 214, 218, 222, 224, 228 NR, 217 switched power
Electrical Rough-In6/7/20186/8/20186/8/2018APART
DetailsRock A. Hudson
We are requesting a final for the roof and 2nd floor and a ceiling inspection for 4 rooms on the 1st floor for tomorrow morning. Our contact for tomorrow is Matt @ ###-####. Thank you, Phone #: ###-#### Inspection requested via web by Clint Tate
Only areas listed were inspected. Level 1, 2 and roof areas not ready.
Employee lounge grid, kitchen storage grid, kitchen office grid only rough in ok cover
Electrical Rough-In6/7/20186/8/20186/7/2018ACANC
DetailsRock A. Hudson
We are requesting a final inspection for the roof and 2nd floor and a ceiling inspection for 4 rooms on the 1st floor for tomorrow morning. Our contact is Rick at ###-####. Thank you. Phone #: ###-#### >> Inspection requested via web by Clint Tate Inspection cancelled from web by: Clint Tate
Electrical Rough-In6/5/20186/6/20186/6/2018PPASS
DetailsRock A. Hudson
Requesting rough inspection of the bar area Phone #: ###-#### Inspection requested via web by Clint Tate
Bar wall rough in ok cover
Electrical Rough-In6/4/20186/5/20186/5/2018APART
DetailsRock A. Hudson
We are requesting a partial final inspection for floors 2, 3, 4, and 5 for tomorrow morning. Our contact is Rick @ ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate
Levels 2 thru 5 checked with items to complete.
518- vanity lights, 503 sparkring, 5th elec. room blanks, breaker blank, 4th- 428 not ready, 419 mirror, 3rd- 328 not ready, check misc tile receptacles for spark rings, 2nd rooms not ready, west storage switch not working, blank cover elevator lobby.
314.20- Discussed if spark rings required for boxes in tile set back a 1/4" or more. Although non combustible as noted spark rings are required.
Electrical Rough-In6/1/20186/4/20186/4/2018APEND
DetailsRock A. Hudson
We are requesting a drop ceiling inspection for floors 2, 3, 4, and 5 for Monday morning. Our contact is Rick @ ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate Levels 2 thru 5 corridor grid rough in ok cover
Electrical Rough-In5/29/20185/30/20185/30/2018APASS
DetailsRock A. Hudson
We are requesting a final inspection for underground for tomorrow morning. Our contact is Rick @ ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate
Underground front pole lights and bases rough in ok cover
Electrical Rough-In5/18/20185/21/20185/21/2018APASS
DetailsRock A. Hudson
We are requesting a rough-in inspection for the laundry room for Monday morning. Our contact is Rick @ ###-####. Thank you, Phone #: ###-#### Inspection requested via web by Clint Tate
Laundry room walls, meeting room soffits complete rough in ok cover
Electrical Rough-In5/16/20185/16/20185/16/2018PPASS
DetailsRock A. Hudson
We are requesting a ceiling rough-in inspection for the meeting room for this afternoon. Our contact is Rick @ ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate Meeting room soffit rough ok cover, small area to be left open for a lighting addition, will call that in when ready.
Electrical Rough-In5/10/20185/11/20185/11/2018APASS
DetailsRock A. Hudson
We are requesting a ceiling pref-unction and bathrooms inspection.
our contact is Rick Badley ###-#### Phone #: ###-#### Inspection requested via web by Larry Looney
110.26- Pool equipment room minimum work space shall be provided for control panel on HVAC unit mounted 9' to 10' above floor. As per Daryl DeGrange clearance reduced to 21" wide and 18" deep. Recessed cans located within 5' horizontal of waters edge and between 7'6" and 12" vertical shall have GFCI protection as per 680.22(B)(2). Pre-function, level 1 men and women's bathroom, pool and pool bath hardlids rough in ok cover
Electrical Rough-In5/9/20185/10/20185/10/2018APASS
DetailsRock A. Hudson
We are requesting an underground light pole inspection on the East side of the project. Our contact is Rick Badley @ ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate
South east light pole base and underground rough in ok cover
Electrical Rough-In5/4/20185/7/20185/7/2018APASS
DetailsRock A. Hudson
We are requesting a underground inspection for the site lighting and a partial final inspection for 1st floor ceilings for Monday morning. Our contact is Rick @ ###-####. Thank you, Phone #: ###-#### Inspection requested via web by Clint Tate
East 2 pole bases, bar wall, east corridor lid, level 1 from buffet to east hard lid rough in ok cover.
Electrical Rough-In5/4/20185/7/20185/4/2018ACANC
DetailsRock A. Hudson
We are requesting an underground inspection for site lighting for Monday morning. Our contact is Rick at ###-####. Thank you Phone #: ###-#### >> Inspection requested via web by Clint Tate Inspection cancelled from web by: Clint Tate
Electrical Rough-In5/3/20185/4/20185/4/2018APASS
DetailsRock A. Hudson
We are requesting a partial final for 2nd floor guest rooms for tomorrow morning. Our contact is Rick ###-####. Thank you, Phone #: ###-#### Inspection requested via web by Clint Tate all of level 2 except 228 ready for furniture
Electrical Rough-In5/2/20185/3/20185/3/2018APART
DetailsRock A. Hudson
We are requesting a partial final for the 2nd floor guest rooms for tomorrow morning. Our contact is Rick @ ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate 228 not ready, 201 thru 204 and 209 thru 211 furniture covering receptacles. Remove for inspection. 205 thru 208 and 212 thru 234 ok for funiture.
Electrical Rough-In4/25/20184/26/20184/26/2018APASS
DetailsRock A. Hudson
We are requesting a partial final inspection for the 3rd floor rooms for tomorrow morning. Our contact is Rick at ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate Pretest to install furniture and refrigerators. OK to install
Electrical Rough-In4/20/20184/23/20184/23/2018PPASS
DetailsRock A. Hudson
1st floor rooms. Contact is Rick 208.250.5652 Phone #: ###-#### Inspection requested via web by Clint Tate 101 thru 104 hardlid rough in ok cover
Electrical Rough-In4/19/20184/20/20184/20/2018PPART
DetailsRock A. Hudson
Partial final guest rooms on LVL4. Ceiling rough-in 4 guest rooms LVL1. Phone #: ###-#### Inspection requested via web by Clint Tate
Level 1 not ready, level 4 401 thru 434 including refer receptacles minus 428 ok for furniture, Level 5 refer receptacles ok.
Electrical Rough-In4/13/20184/16/20184/16/2018APASS
DetailsRock A. Hudson
We are requesting a partial final inspection for 5th floor rooms for Monday morning. Our contact is Rick @ ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate Pretest prior to the install of furniture. Level 5 501 thru 534 except 528 ok for furniture.
Electrical Rough-In4/10/20184/11/20184/11/2018PPASS
DetailsRock A. Hudson
We are requesting a ceiling rough-in inspection for Room 28 on 2, 3, 4, and 5 for the access holes as well as the elevator lobbies. Our contact is Rick @ ###-####. Thank you Phone #: ###-#### Inspection requested via web by Clint Tate
Rooms noted and elevator soffits and drop ceilings and underground for fire pit area rough in ok cover
Electrical Rough-In3/28/20183/29/20183/29/2018APASS
DetailsRock A. Hudson
Underground for generator pad Phone #: ###-#### Inspection requested via web by Clint Tate
Rough in ok cover
Electrical Rough-In3/26/20183/27/20183/27/2018APASS
DetailsRock A. Hudson
We are requesting a rough-in inspection for the hallways and ceilings on floors 2, 3, 4, and 5 for tomorrow morning. Our contact is Rick @ ###-####. Thank you Phone #: ###-#### Inspection requested via web by Larry Looney
Cable tray bonds complete drop hardlids noted rough in ok cover
Electrical Rough-In3/19/20183/20/20183/20/2018APASS
DetailsRock A. Hudson
We are requesting a wall rough-in inspection in meeting room interior walls for tomorrow morning. Our contact is Rick @ ###-####. Thank you, Phone #: ###-#### Inspection requested via web by Clint Tate
Walls noted rough in ok cover
Electrical Rough-In3/12/20183/13/20183/13/2018APASS
DetailsRock A. Hudson
We are requesting a 1st floor lounge wall rough-in and entry vestibules rough-in inspection for tomorrow morning. Our contact Rick @ ###-####. Thank you. Phone #: ###-#### Inspection
requested via web by Clint Tate
Will check water heater disconnecting means in future for access.
Out entry cans both covers, north offices, lounge south wall rough in ok cover
Electrical Rough-In2/20/20182/21/20182/21/2018APASS
DetailsRock A. Hudson
We are requesting a wall rough-in inspection for the meeting room outside walls for tomorrow morning. Our contact is Rick @ ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate
Exterior walls only of meeting room and conference room and bathroom wall rough in ok cover
Electrical Rough-In1/30/20181/30/20181/30/2018PPASS
DetailsRock A. Hudson
We are requesting a ceiling rough-in inspection for the elevator room for this afternoon. Our contact is Rick @ ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate Elevator room hardlid rough in ok cover
Electrical Rough-In1/29/20181/30/20181/30/2018APASS
DetailsJames Ady
We are requesting drop ceiling inspection for the 2 ; 3 floors west for tomorrow morning. Our contact is Rick @ ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate 220-227, 229-234 312-327, 329-334 Drop ceiling only ok to cover
Electrical Rough-In1/17/20181/18/20181/18/2018APASS
DetailsRock A. Hudson
We are requesting a rough-in inspection for the 4th floor East rooms drop ceiling for tomorrow morning. Our contact is Rick @ ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate
412, 414, 416 thru 427, 429 thru 434 drop ceilings rough in ok cover
Electrical Rough-In1/16/20181/16/20181/16/2018PPASS
DetailsRock A. Hudson
We are requesting a 1st floor kitchen wall rough-in and a 5th floor drop ceiling rough-in inspection for this afternoon. Our contact is Rick @ ###-####.
Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate
512, 514, 516 thru 527, 529 thru 534 droplids and kitchen and bathroom walls and firelids rough in ok cover
Electrical Rough-In1/8/20181/8/20181/8/2018PPASS
DetailsRock A. Hudson
Drop ceilings on 2nd, 4th, and 1st floor corridor - east end. Phone #: ###-#### Inspection requested via web by Clint Tate
Level 1 east corridor walls, level 2 rooms 201 thru 210 drop lids, level 4 rooms 412 thru 420 drop lids. Areas noted rough in ok cover
Electrical Rough-In1/4/20181/5/20181/5/2018PPASS
DetailsJames Ady
We are requesting a drop ceiling rough-in inspection for level 2 and 3 on the east side please. Our contact is Rick @ ###-####. Thank you Phone #: ###-#### Inspection requested via web by Clint Tate Rooms 211-220 and 311-320 Drop lid only ok to cover
Electrical Rough-In12/27/201712/28/201712/28/2017APASS
DetailsRock A. Hudson
We are requesting a rough-in inspection for the Market Place walls, laundry room walls, 1st floor tenant room walls, 3rd floor west rooms drop ceilings and a service inspection for tomorrow morning. Our contact is Rick @ ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate
Market place walls, laundry walls, 4 tenant room walls level 1, 301 thru 311 drop lids
Permanent Service12/28/201712/28/201712/28/2017PPASS
DetailsRock A. Hudson
We are requesting a rough-in inspection for the Market Place walls, laundry room walls, 1st floor tenant room walls, 3rd floor west rooms drop ceilings and a service inspection for tomorrow morning. Our contact is Rick @ ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate
p/s u/g n ok
Electrical Rough-In12/20/201712/21/201712/21/2017APART
DetailsRock A. Hudson
We are requesting wall rough-in inspections for pool/spa area, fitness area, market place, kitchen and 2nd and 3rd floor electrical rooms for tomorrow morning. Our contact is Rick @ ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate
Market place, kitchen areas not ready, Added level 4 units 401 thru 411 drop lids, level 2 and 3 electrical rooms, and walls in pool, spa, fitness areas rough in ok cover
Electrical Rough-In12/13/201712/14/201712/14/2017PPASS
DetailsRock A. Hudson
We are requesting a rough-in inspection for 2nd floor walls and ceilings and 1st floor complete ceiling for tomorrow afternoon. Our contact is Rick @ ###-####. Thank you,
Phone #: ###-#### Inspection requested via web by Clint Tate
219 thru 234 and 238, level 1 firelids except west meeting room rough in ok cover
Electrical Rough-In12/11/201712/12/201712/12/2017APASS
DetailsRock A. Hudson
We are requesting a rough-in inspection on the remaining 3rd floor rooms and hallways. Also Stairwell # 2 for tomorrow morning. Our contact is Rick @ ###-####. Thank you, Phone #: ###-####
Inspection requested via web by Clint Tate
Rooms 319 thru 334 and 338, level 3 hall way ceiling, stair 2 rough in ok cover.
Available fault current 50,250 amps posted. Will request when able to install covers of service gear. Scaffold blocks access.
Permanent Service12/6/201712/7/201712/7/2017PFAIL
DetailsRock A. Hudson
We are requesting a permanent service inspection for tomorrow afternoon. Also need a rough-in for 4th rm# 422 ; 438 and 2nd ; 3rd floor hallways. Our contact is Rick @ ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate
110.24- Available fault current shall be posted prior to permenant inspection.
65K rated main 6x600kcmil service entrance conductors 2520 amp rating.
Electrical Rough-In12/7/201712/7/201712/7/2017PPART
DetailsRock A. Hudson
We are requesting a permanent service inspection for tomorrow afternoon. Also need a rough-in for 4th rm# 422 ; 438 and 2nd ; 3rd floor hallways. Our contact is Rick @ ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate
Level 3 ceiling insulated prior to inspection, shall be removed.
West stairway not ready,
level 1 work area walls,
level 2 hall fire lid,
level 4 rooms 422 and 438
Areas noted rough in ok cover
Electrical Rough-In11/30/201712/1/201712/1/2017PPASS
DetailsEric Story
We are requesting a rough in drop ceilings on 5th, walls, hallway ; ceiling on 4th and complete electrical rooms wall ; ceiling on 4th ; 5th. And stairwell #1. Our contact of Rick @ ###-####. Thank you! Phone #: ###-#### Inspection requested via web by Clint Tate
East stair,5th floor rooms501-511 hard lids and electrical room wall,4th floor 427-430 (minus 428 @ storage) and electrical room walls and unit walls ok to cover..
Electrical Rough-In11/22/201711/27/201711/27/2017PPASS
DetailsRock A. Hudson
We are requesting a rough-in inspection for 5th floor west side and 1st floor mechanical room walls for Monday Nov. 27th in the afternoon. Our contact is Rick @ ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate
519 thru 534 and storage walls and west corridor ceiling, 1st floor mechanical room walls only rough in ok cover
Electrical Rough-In11/14/201711/15/201711/15/2017PPART
DetailsRock A. Hudson
We are requesting a rough-in inpsection for the 2nd floor rooms, stairwell 1 and we are also requesting a consult inspection for the roof for tomorrow afternoon. Our contact is Rick @ ###-####. Thank you Phone #: ###-#### Inspection requested via web by Clint Tate
Stair 1 not ready, West of grid line 12 roof OK to wire below. Units 202 thru 218 rough in ok cover.
Conference11/7/201711/7/201711/7/2017ADONE
DetailsDaryl DeGrange
Responded to complaint through DBS. Spoke with Rick Bagley and David Banks (Superintendent) rain water getting in west half of building, floors 2,3,4,5 Hold on West half of building untill dried in and roofing completed and inspected.
Electrical Rough-In11/6/201711/6/201711/6/2017PPASS
DetailsJames Ady
We are requesting a rough-in inspecation for the walls on the 3rd floor for this afternoon. Our contact is RIck ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate 301-318 and 337 storage ok to cover
Electrical Rough-In10/23/201710/24/201710/24/2017PPASS
DetailsRock A. Hudson
We are requesting a rough-in inspection for tomorrow afternoon on level 4. Our contact is Rick Badley @ ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate
401 thru 414, 416, 417, 418 only rough in ok cover
Electrical Rough-In10/13/201710/16/201710/16/2017APASS
DetailsRock A. Hudson
5th level rooms. Phone #: ###-#### Inspection requested via web by Clint Tate
Rooms 501 thru 518 and 537 storage rough in ok cover
Electrical Rough-In10/10/201710/11/201710/11/2017APASS
DetailsRock A. Hudson
We are requesting ceiling and wall rough-in inspections on the first floor for tomorrow morning. Our contact is Rick @ ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate
Managers work area, laundry, east of laundry to stair fire lids and 1 side construction office for heat lonly rough in ok cover
Electrical Rough-In9/25/20179/26/20179/26/2017PPASS
DetailsRock A. Hudson
We are requesting a ceiling inspection for levels 1-5 corridors for tomorrow afternoon. Our contact is Rick @ ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate
Corridors firelids levels 1 thru 5 from grid lines 1 to 12 rough in ok cover
Temporary Service9/5/20179/6/20179/6/2017ACANC
DetailsRock A. Hudson
Temp power inspection. Please call Rick ###-####. Phone #: ###-#### Inspection requested via web by Clint Tate
needs a seperate permit
Conference8/23/20178/23/20178/23/2017PDONE
DetailsRock A. Hudson
We are requesting a consult with the inspector to discuss what we need to do to run romex before roof is on for this afternoon. Our contact is Rick @ ###-####. Thank you Phone #: ###-#### Inspection requested via web by Clint Tate
334.12- NM cable shall not be installed in a wet or damp location. If installed and becomes wet or damp it shall be replaced.
Electrical Rough-In8/10/20178/14/20178/14/2017PPASS
DetailsRock A. Hudson
we are requesting an underground inspection for the pool bonding for Monday Aug. 14th in the afternoon. Our contact is Rick @ ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate
Discussed the use of AFC multi 12 conductor cables and if derating as per 310.15(B)(3) apply. Listing confirmed and derating does apply as per manufacturers instructions.
Underground for south footings and perimeter bond for pool, ladders, and chair rough in ok cover.
Electrical Rough-In8/2/20178/3/20178/3/2017PPASS
DetailsRock A. Hudson
We requesting an underground inspection for tomorrow afternoon. Our contact is Rick @ ###-####. Thank you,
Phone #: ###-#### Inspection requested via web by Clint Tate
Service entrance conduits rough in ok cover
Electrical Rough-In7/13/20177/14/20177/14/2017APASS
DetailsRock A. Hudson
We are requesting an underground inspection for tomorrow morning. Our contact is Rick @ ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate
Contractor providing 2nd concrete encased for pool equipment. Equipment grounding conductor shall be minimum of #4 to this room to be added to grounding electrode system. Rough in ok cover
Electrical Rough-In6/26/20176/27/20176/27/2017APASS
DetailsRock A. Hudson
We are requesting a pool bonding inspection for tomorrow morning. Our contact is Nic @ ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate
Pool and hot tub 4- corners, luminaire bonding and underground rough in ok cover
Electrical Rough-In5/4/20175/5/20175/5/2017APASS
DetailsRock A. Hudson
We are requesting a ufer inspection and a underground inspection for tomorrow morning on this project. Our contact is Nic ###-####. Thank you Phone #: ###-#### Inspection requested via web by Clint Tate
Underground for floor boxes (listing confirmed) and conctrete encased for central area rough in ok cover