Final | 4/24/2018 | 4/24/2018 | 4/24/2018 | P | PASS |
Rock A. Hudson
|
|
|
404.8 ex 2- Disconnect switch for equipment may be above 6'7" if accessible by potable means. Final ok
|
Final | 4/17/2018 | 4/18/2018 | 4/18/2018 | A | FAIL |
Rock A. Hudson
|
|
|
We are not currently on site. Please call Frank 30 minutes prior to arrival so he can meet you. Phone #: ###-#### Inspection requested via web by Kelly Tarter Chiller disconnecting means shall be located at a readily accessible location below 6'7". Handle on units shall have a platform built below operable handle so handle location 6'7" or lower.
|
Conference | 2/15/2018 | 2/15/2018 | 2/15/2018 | P | DONE |
Eric Story
|
|
|
Frank Phone #: ###-#### Discussed work clearences in Fire riser room, Being there is no serviceable equipment ina VFD and room is only accessible by qualified personal motor that is in front of VFD is ok to be installed inn that location
|
Electrical Rough-In | 1/9/2018 | 1/10/2018 | 1/10/2018 | A | PASS |
Eric Story
|
|
|
This is an underground inspection that will be a two part dig. We are requesting an inspection a 10:30 a.m. to see what we are doing. We will then backfill and proceed to the next section. Phone #: ###-#### Inspection via web by Kelly Tarter U/G from main building ok to cover
|
Electrical Rough-In | 7/11/2017 | 7/11/2017 | 7/11/2017 | A | PASS |
Eric Story
|
|
|
Tyler is looking to have his grounding looked at before the building slab is poured. Phone #: ###-#### Inspection requested via web by Kelly Tarter Grounding ring ok cover
|
Electrical Rough-In | 7/6/2017 | 7/7/2017 | 7/7/2017 | A | PASS |
Eric Story
|
|
|
Please contact Tyler at ###-####. Unerground inspection on the 5 underslab conduits in the chiller building. Phone #: ###-#### Inspection requested via web by Kelly Tarter u/g around back ok
|