ELE-Aging Inspection | 11/21/2019 | 11/21/2019 | 11/21/2019 | | PASS |
Mark Moncarr
|
|
|
Met with Clayton onsite and inspected cooling tower. Ok final.
|
Final | 11/21/2019 | 11/21/2019 | 11/21/2019 | P | PASS |
Mark Moncarr
|
|
|
Met with Clayton onsite and inspected cooling tower. Ok final.
|
Electrical Rough-In | 8/19/2019 | 8/19/2019 | 8/19/2019 | A | CANC |
Mark Moncarr
|
|
|
Contact: Clayton Pennington Final for parking lot and cooling tower please Phone #: ###-#### Inspection requested via web by Deb Gooden Cancelled rough in. Added a partial final.
|
Final | 8/19/2019 | 8/19/2019 | 8/19/2019 | P | PART |
Mark Moncarr
|
|
|
Partial until Public Works does there street light inspection. Then call back in for a final.
|
Electrical Rough-In | 7/24/2019 | 7/24/2019 | 7/24/2019 | P | PASS |
Mark Moncarr
|
|
|
Contact: Clayton Pennington..... pole light inspection please Phone #: ###-#### Inspection requested via web by Deb Gooden Ok cover pole bases NE corner of property
|
Final | 1/24/2019 | 1/24/2019 | 1/24/2019 | P | PART |
Mark Moncarr
|
|
|
Clayton ###-#### Partial final. Kitchen ok. Hooksticks made for 2 disc on S wall for D/W's. Ballard lighting on property, and cooling tower still to finish. Approved for TCO.
|
Electrical Rough-In | 1/24/2019 | 1/24/2019 | 1/24/2019 | P | CANC |
Mark Moncarr
|
|
|
CONTACT: CLAYTON PENNINGTON, FINAL INSPECTION FOR KITCHEN AREA PLEASE Phone #: ###-#### Inspection requested via web by Deb Gooden Should have been partial final.
|
Electrical Rough-In | 1/9/2019 | 1/10/2019 | 1/10/2019 | A | PART |
Mark Moncarr
|
|
|
Contact: Clayton Pennington. electrical final per building tco plan Phone #: ###-#### Inspection requested via web by Deb Gooden Ok for temp occupancy. All electrical installed with no need of safing off any items. Egress and emer lighting in place. Kitchen only area left to be done before final. Doors to kitchen should be in place to prohibit access to non-essential personnel prior to final. Talked to electrician on-site about providing hookstick style disconnecting hangles to be installed for 2 disc on S wall of kitchen for dishwashers.
|
Electrical Rough-In | 1/4/2019 | 1/7/2019 | 1/7/2019 | A | PASS |
Mark Moncarr
|
|
|
CONTACT: CLAYTON PENNINGTON... ceiling inspection, corridor area A please Phone #: ###-#### Inspection requested via web by Deb Gooden Ok cover ceilings main hall N entry.
|
Electrical Rough-In | 12/28/2018 | 12/28/2018 | 12/28/2018 | P | PASS |
Mark Moncarr
|
|
|
Contact: Clayton Pennington... ceiling inspection for the kitchen ; music room please Phone #: ###-#### Inspection requested via web by Deb Gooden Ok cover kitch ceiling, music rm ceiling and music storage.
|
Electrical Rough-In | 12/17/2018 | 12/18/2018 | 12/18/2018 | A | PART |
Mark Moncarr
|
|
|
CONTACT: CLAYTON PENNINGTON...FINAL ON AREA D CLASSROOMS PLEASE Phone #: ###-#### Inspection requested via web by Deb Gooden All classrooms on 2nd flr., S side ok final.
|
Electrical Rough-In | 12/11/2018 | 12/12/2018 | 12/12/2018 | A | PASS |
Mark Moncarr
|
|
|
Contact: Clayton Pennington.... ceiling inspection area C 2nd floor please Phone #: ###-#### Inspection requested via web by Deb Gooden Ok cover 1st-2nd flr main halls, and remainder of 2nd flr classrooms.
|
Electrical Rough-In | 12/5/2018 | 12/6/2018 | 12/6/2018 | A | PART |
Mark Moncarr
|
|
|
Contact: Clayton Pennington.... Final for 6 classrooms areaB please Phone #: ###-#### Inspection requested via web by Deb Gooden Partial on all classrooms AREA-B. A couple locations where electrician was going to verify need for GFI. Will check on next inspection.
|
Electrical Rough-In | 11/26/2018 | 11/26/2018 | 11/26/2018 | P | PASS |
Mark Moncarr
|
|
|
Contact: Clayton Pennington. ceiling inspection 2nd floor area D please Phone #: ###-#### Inspection requested via web by Deb Gooden Ok cover area D classroom ceilings
|
Electrical Rough-In | 11/8/2018 | 11/9/2018 | 11/9/2018 | P | PASS |
Mark Moncarr
|
|
|
CONTACT: CLAYTON PENNINGTON AREA B NORTH CEILING INSPECTION PLEASE Phone #: ###-#### Inspection requested via web by Deb Gooden Ok cover Area B classroom ceilings.
|
Electrical Rough-In | 10/29/2018 | 10/29/2018 | 10/29/2018 | P | PASS |
Mark Moncarr
|
|
|
Contact: Clayton Pennington... music room inspection please Phone #: ###-#### Inspection requested via web by Deb Gooden Ok cover Area-A music rm and storage.
|
Electrical Rough-In | 10/19/2018 | 10/22/2018 | 10/22/2018 | A | PASS |
Mark Moncarr
|
|
|
CONTACT CLAYTON PENNINGTON Phone #: ###-#### Inspection requested via web by Deb Gooden Ok cover walls 1st floor kitch, and 2nd floor 2 bath lids.
|
Electrical Rough-In | 10/4/2018 | 10/4/2018 | 10/4/2018 | A | PASS |
Mark Moncarr
|
|
|
Contact: Clayton Pennington...wall rough-in 6 classrooms, 2nd floor please Phone #: ###-#### Inspection requested via web by Deb Gooden Ok cover 5 classrooms 2nd floor.
|
Electrical Rough-In | 9/25/2018 | 9/25/2018 | 9/25/2018 | P | PASS |
Mark Moncarr
|
|
|
Contact: Clayton Pennington.... wall inspection in 4 rooms please Phone #: ###-#### Inspection requested via web by Deb Gooden Ok cover 3 rooms main level, and 2 baths up.
|
Permanent Service | 9/25/2018 | 9/25/2018 | 9/25/2018 | P | PASS |
Mark Moncarr
|
|
|
CONTACT: Clayton Pennington Phone #: ###-#### Inspection requested via web by Deb Gooden p/s u/g n ok
|
Electrical Rough-In | 8/27/2018 | 8/28/2018 | 8/28/2018 | A | PASS |
Mark Moncarr
|
|
|
Contact: Clayton Pennington wall rough in inspection please Phone #: ###-#### Inspection requested via web by Deb Gooden Ok cover 1st floor exterior E wall library, exterior W wall admin, interior tech rm, 2 baths. 2nd floor 6 classrooms interior walls.
|
Electrical Rough-In | 6/19/2018 | 6/20/2018 | 6/20/2018 | A | PASS |
Mark Moncarr
|
|
|
Contact: Clayton Pennington Phone #: ###-#### Inspection requested via web by Deb Gooden Ok cover interior and exterior walls in locations B and D.
|
Electrical Rough-In | 2/27/2018 | 2/28/2018 | 2/28/2018 | A | PASS |
Mark Moncarr
|
|
|
Contact: Clayton Pennington underground inspection please Phone #: ###-#### Inspection requested via web by Deb Gooden Ok cover 3/4" conduit on SE side of property. Conduits used for HVAC and power for outlets in classrooms.
|
Electrical Rough-In | 2/13/2018 | 2/13/2018 | 2/13/2018 | P | PASS |
Mark Moncarr
|
|
|
Contact: Clayton Pennington - underground inspection please Phone #: ###-#### Inspection requested via web by Deb Gooden Ok cover underground in on NW corner. Mechanical room.
|
Electrical Rough-In | 1/26/2018 | 1/26/2018 | 1/26/2018 | P | PASS |
Mark Moncarr
|
|
|
Contact: Clayton Pennington. Under inspection please Phone #: ###-#### Inspection requested via web by Deb Gooden Ok cover ufer. #4.
|
Electrical Rough-In | 11/22/2017 | 11/22/2017 | 11/22/2017 | P | PASS |
Mark Moncarr
|
|
|
Contact: Jacob Giese - underground inspection please Phone #: ###-#### Inspection requested via web by Deb Gooden Ok cover. Received pics from contractor. Depth is per code.
|
Conference | 11/21/2017 | 11/21/2017 | 11/21/2017 | P | DONE |
Mark Moncarr
|
|
|
Contact: Jacob Giese Phone #: ###-#### Inspection requested via web by Deb Gooden Discussed install of pumps for lift station. Pumps in lift station will be installed via core drill with a rigid 90 vs using an LB. Seal offs are installed at disconnect end.
|