Final | 8/14/2018 | 8/15/2018 | 8/14/2018 | A | PASS |
Rock A. Hudson
|
|
|
Danny is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen Corrections complete. Final ok
|
Electrical Rough-In | 8/14/2018 | 8/14/2018 | 8/14/2018 | P | PASS |
Rock A. Hudson
|
|
|
Ceiling Cover... Danny is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Back patios level 1 and 2 grid rough in ok cover Level 1 and 2 patio
|
Final | 7/10/2018 | 7/11/2018 | 7/11/2018 | A | FAIL |
Rock A. Hudson
|
|
|
Looking for a TCO. Please come as early as possible. Danny is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen 110.3- Outdoor receptacles not working. 110.3- Level 2 (Kim D office) receptacle outlets not working. 110.3- Baseboard manufacurers instructions state receptacle outlets shall not be installed over baseboard heaters. 110.26- Level 2 (Kim D office) Minimum work space shall be provided for panel K2-P1. Built in desk installed in front of panel. 210.70(A)(2)- Each door with access to exterior shall have a luminaire installed for egress. 300.15- All wiring shall terminate in a box. Patio light wires. 314.25- All boxes shall have covers. Light box over stair and wire for light over door. BCC 4 05 17- Unlawful electrical procedures. All work to be performed by a licensed electrical contractor. It has been reported some receptacles were changed by an unlicensed person.
|
Electrical Rough-In | 6/26/2018 | 6/26/2018 | 6/26/2018 | P | PASS |
Rock A. Hudson
|
|
|
Wall Cover and ceiling on floors 1 and 2. Danny is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Level 1 and 2 back patios walls and emergency light and occ sensor grid rough in ok cover
|
Electrical Rough-In | 6/22/2018 | 6/25/2018 | 6/25/2018 | A | PASS |
Rock A. Hudson
|
|
|
Ceiling cover. Danny is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen Basement grid rough in ok cover
|
Electrical Rough-In | 6/21/2018 | 6/22/2018 | 6/22/2018 | A | FAIL |
Rock A. Hudson
|
|
|
Ceiling Cover. Danny is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen 330.30- MC shall be supported independant of grid. All luminaires shall be secured to structure basement. Call contact he stated he wanted to reschedule for monday anyway. Will recall when ready.
|
Electrical Rough-In | 6/21/2018 | 6/22/2018 | 6/21/2018 | A | CANC |
Rock A. Hudson
|
|
|
Ceiling cover. Danny is the contact Phone #: ###-#### >> Inspection requested via web by Buster Bowen Inspection cancelled from web by: Buster Bowen
|
Electrical Rough-In | 6/15/2018 | 6/18/2018 | 6/18/2018 | A | PART |
Rock A. Hudson
|
|
|
Ceiling cover. Danny is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen Levels 1 and 2 only basement not ready gri as noted rough in ok cover
|
Electrical Rough-In | 1/23/2018 | 1/23/2018 | 1/23/2018 | A | PASS |
Rock A. Hudson
|
|
|
Wall Cover. Danny is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Main level and basement wall rough in ok cover
|
Electrical Rough-In | 1/12/2018 | 1/16/2018 | 1/16/2018 | A | PASS |
Rock A. Hudson
|
|
|
Wall Cover. Danny is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Level 2 and 3 walls and hardlid rough in ok cover
|
Conference | 12/7/2017 | 12/7/2017 | 12/7/2017 | P | DONE |
Rock A. Hudson
|
|
|
As per head structural Bob Archibald. Due to plan review on building permit being completed prior to 7-1-17 the 2014 version of NEC will apply.
|
Permanent Service | 12/4/2017 | 12/4/2017 | 12/4/2017 | P | PASS |
Rock A. Hudson
|
|
|
Danny is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen p/s u/g n ok
|