Final | 6/24/2019 | 6/25/2019 | 6/25/2019 | A | PASS |
Mark Moncarr
|
|
|
Jill Phone #: ###-#### Ok final. All recepts are TR. Wires in open ceiling are protected. J-box covers installed. A platform has been built as panel is in stairwell. There was really no place for panel to be moved to without an excessive cost.
|
Final | 5/22/2019 | 5/22/2019 | 5/22/2019 | P | NR |
Mark Moncarr
|
|
|
Jill Phone #: ###-####
|
Final | 2/15/2019 | 2/19/2019 | 2/19/2019 | A | CANC |
Mark Moncarr
|
|
|
Jill ###-#### Talked to Jill. She is going to call for a final sometime in the next couple of weeks.
|
Final | 2/15/2019 | 2/15/2019 | 2/15/2019 | P | CANC |
Mark Moncarr
|
|
|
Please call for access- Jill Phone #: ###-#### Re-scheduled for 2/19/19
|
Final | 1/24/2019 | 1/31/2019 | 1/31/2019 | A | NR |
Mark Moncarr
|
|
|
Call 15 minutes ahead // Jill Phone #: ###-#### Going to schedule for next week.
|
Final | 12/27/2018 | 12/28/2018 | 12/28/2018 | A | CANC |
Mark Moncarr
|
|
|
Jill Phone #: ###-#### Received voicemail from owner. Wont be ready until next week.
|
Electrical Rough-In | 7/19/2018 | 7/20/2018 | 7/20/2018 | A | PASS |
Mark Moncarr
|
|
|
Jill--bathroom floor heating only-please call 30 mins prior for access Phone #: ###-#### Ok cover floor heat up bath.
|
Conference | 6/2/2018 | 6/5/2018 | 6/5/2018 | P | DONE |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by jill monteith Looked at basement RI, 2 outlets kitch, upper bath.
|
Electrical Rough-In | 6/5/2018 | 6/5/2018 | 6/5/2018 | P | PASS |
Mark Moncarr
|
|
|
Ok cover basement, upper bath and 2 outlets installed in kitchen.
|