Final | 10/5/2018 | 10/5/2018 | 10/5/2018 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Jerry Moore Talked to contrator by phone. I did a scheduled final inspection for the pool house on 9/11/18. There were 2 permits on job. Ok final.
|
Permanent Service | 8/15/2018 | 8/16/2018 | 8/16/2018 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Jerry Moore 2 services located side by side. Service needing power is on the right side of the pedistal built. It is for the house power. p/s u/g n ok
|
Electrical Rough-In | 6/28/2018 | 6/29/2018 | 6/29/2018 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Jerry Moore Ok cover pool rm back of property.
|
Electrical Rough-In | 6/6/2018 | 6/7/2018 | 6/7/2018 | A | PASS |
Mark Moncarr
|
|
|
Need underground conduit inspection Phone #: ###-#### Inspection requested via web by Jerry Moore Ok cover conduit for pool equiptment.
|