ELE-Aging Inspection | 7/17/2020 | 7/17/2020 | 7/17/2020 | | DONE |
Daryl DeGrange
|
|
|
See final
|
Final | 7/17/2020 | 7/17/2020 | 7/17/2020 | P | PASS |
Daryl DeGrange
|
|
|
Job complete, Final ok
|
Electrical Rough-In | 6/25/2018 | 6/26/2018 | 6/26/2018 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by David Boldridge Final ok
|
Electrical Rough-In | 6/26/2018 | 6/26/2018 | 6/26/2018 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by David Boldridge Addition of 1 garage receptacle rough in ok cover.
|
Conference | 6/22/2018 | 6/25/2018 | 6/25/2018 | A | DONE |
Rock A. Hudson
|
|
|
Please call ahead for access - David Phone #: ###-#### Discussed moving 3-way switch near entrance to house from garage. Done at time of conference. Also adding receptacle in garage on north wall. OK to come off existing circuit and installing a tamper resistant GFCI protected receptacle. Gave copy of most frequently asked questions. Will call for rough in inspection when ready.
|