Final | 1/6/2020 | 1/7/2020 | 1/6/2020 | A | PASS |
Mark Moncarr
|
|
|
Jared Phone #: ###-#### TR recepts installed a long with spark rings. Ok final.
|
Final | 1/2/2020 | 1/3/2020 | 1/3/2020 | A | FAIL |
Mark Moncarr
|
|
|
Judd Phone #: ###-#### 1. TR recepts needed in kitchen.
|
Electrical Rough-In | 3/22/2019 | 3/22/2019 | 3/22/2019 | P | PASS |
Mark Moncarr
|
|
|
Call ahead // Jud Phone #: ###-#### Ok cover addition.
|
Electrical Rough-In | 3/19/2019 | 3/19/2019 | 3/19/2019 | P | NR |
Mark Moncarr
|
|
|
Judd Phone #: ###-####
|
Rough-In Permanent Service | 9/17/2018 | 9/17/2018 | 9/17/2018 | P | PASS |
Mark Moncarr
|
|
|
Jud Phone #: ###-#### Panel upgrade. Look for 1 1/2' KO seal on final. p/s u/g rec ok
|
Final | 6/27/2018 | 6/27/2018 | 6/27/2018 | P | PASS |
Mark Moncarr
|
|
|
i have the kitchen roughed in and need it to be looked at so i can cover it before i move on. Phone #: ###-#### Inspection requested via web by Judd Baker Ok cover W and N wall kitchen.
|