Permit NumberELE18-02687
StatusFinaled
Name LEA ELECTRIC LLC
Site Address 2120 S HUDSON AVE
Project NameBld B
Customer Number3817
ePlanReviewNo
Description
New: Full Electrical installation of ground up construction including underground, conduit, wiring, panels, gear, lights, lighting control, receptacles, security, and fire alarm
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final6/10/20196/11/20196/11/2019APASS
DetailsEric Story
Building B Units 104, 105, 106, 107, 204, 205, 206, 207, 304, 305, 306, 307
Contact Scott Wilson
Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek
BLD B final for all units and carport ok to occupy
Occ card signed
Electrical Rough-In6/10/20196/10/20196/10/2019PPASS
DetailsEric Story
Building B Units 100,101,102,103, 200,201,202,203,300,301,302,303
Contact Scott Wilson
Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek
Units as requested all checked out with electrical install for a partial final on units
Electrical Rough-In4/1/20194/1/20194/1/2019PPASS
DetailsEric Story
Pole light inspection
Contact Scott Wilson
Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek
Light pole and U/G ok to cover
Electrical Rough-In2/13/20192/13/20192/13/2019PPASS
DetailsEric Story
Drop ceiling inspection for Units 104,105,106,107, 204,205,206,207, 304,305,306,307
Contact Scott Wilson
Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek
Drop ceilings as requested ok to cover
Electrical Rough-In2/7/20192/7/20192/7/2019PPASS
DetailsEric Story
Building B Unit 102 Rough-in for Drop Ceilings
Contact Scott Wilson
Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek
102 in bld B drop ceiling ok to cover
Electrical Rough-In1/31/20192/1/20192/1/2019PPASS
DetailsRock A. Hudson
Building B Rough in for the drop ceilings in Units 100, 101, 103
(102 can’t be done because of a change in the unit),
Units 200, 201, 202, 203, 300, 301, 302, 303
Contact Scott Wilson
Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek
Areas as noted drop lids rough in ok cover
Electrical Rough-In1/22/20191/22/20191/22/2019PPASS
DetailsJames Ady
Building B Riser Room
Contact Scott Wilson
Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek rough in ok
Electrical Rough-In12/21/201812/21/201812/21/2018PPASS
DetailsEric Story
Rough in Building B Units, 104, 105, 106, 107, 204, 205. 206, 207, 304, 305, 306, 307 Phone #: ###-#### Inspection requested via web by Scott Wilson
Remaning untis in bld b ok to cover
Rough-In Permanent Service12/17/201812/17/201812/17/2018APASS
DetailsEric Story
Building B Service Rough In
Contact Scott Wilson
Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek
25 meters needed
AFC rating 17k@23k
p/s u/g n ok
Electrical Rough-In12/11/201812/12/201812/12/2018PPASS
DetailsEric Story
Building B rough for cover in north units.
Units 104, 105, 106, 107, 204, 205, 206, 207, 304, 305, 306, 307
Contact Scott Wilson
Thank you
Phone #: ###-#### Inspection requested via web by Cathy Duchek
Buiding B North units only ok to cover
Electrical Rough-In12/5/201812/5/201812/5/2018APASS
DetailsEric Story
Rough in for cover for Building B breezeway.
Contact Scott Wilson
Thank you. Phone #: ###-#### Inspection requested via web by Cathy Duchek
Building B breezeways ok to cover
Electrical Rough-In11/14/201811/14/201811/14/2018APASS
DetailsEric Story
Building B secondary underground conduits.
Contact Scott Wilson
Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek
Building B secondaries ok to cover
Electrical Rough-In7/17/20187/17/20187/17/2018PPASS
DetailsEric Story
Ufer and underground conduit inspection.
Contact Scott Wilson
Thank you, Phone #: ###-#### Inspection requested via web by Tom Betty
U/G and cocrete encased electrode ok to cover