Final | 1/24/2019 | 1/25/2019 | 1/25/2019 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Robert Carter Corrections made. Final ok
|
Final | 1/15/2019 | 1/16/2019 | 1/16/2019 | P | FAIL |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Robert Carter 210.12- All outlets located in bedroom areas shall have GFCI protection. 314.25- All boxes shall have covers. HVAC control switch in hallway.
|
Electrical Rough-In | 8/13/2018 | 8/14/2018 | 8/14/2018 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Robert Carter Light boxes to be cut in to ceiling, Ceiling boxes mounted at rough in shall have 1"+ mud rings. Rough in ok cover
|
Conference | 7/31/2018 | 7/31/2018 | 7/31/2018 | P | DONE |
Rock A. Hudson
|
|
|
confirmation on application Phone #: ###-#### Inspection requested via web by Robert Carter Discussed type of lighting used for plenum above a 1 hr fire rated ceiling. All penetrations shall have at least a 1 hr fire rated box installed and all wiring installed in plenum area shall be plenum rated. Halo recess cans do ot have a fire rating. Contactor looking at a small LED surface mount luminaire that mounts to 2 hr rated remodel electrical box.
|