Final | 3/28/2019 | 3/29/2019 | 3/29/2019 | A | PASS |
Mark Moncarr
|
|
|
Max Phone #: ###-#### Ok final pumphouse.
|
Electrical Rough-In | 3/29/2019 | 3/29/2019 | 3/29/2019 | P | PASS |
Mark Moncarr
|
|
|
2-2" conduits on N side of river by pumphouse for future fiber optics.
|
Electrical Rough-In | 3/4/2019 | 3/5/2019 | 3/5/2019 | A | PASS |
Mark Moncarr
|
|
|
Max Phone #: ###-#### Ok cover 3-2'"conduits, and 2-2/12" to new vault on S side of river.
|
Electrical Rough-In | 2/13/2019 | 2/14/2019 | 2/14/2019 | A | PASS |
Mark Moncarr
|
|
|
Max Phone #: ###-#### Discussed moving of equipt that supplies air to S side of wall. Equipt was supposed to be beside electrical, but was to big to be installedin original space. It does not interfere with electrical installation.
|
Electrical Rough-In | 1/14/2019 | 1/14/2019 | 1/14/2019 | P | PASS |
Mark Moncarr
|
|
|
Max Phone #: ###-#### Ok cover walls and ceilings pump house.
|
Electrical Rough-In | 12/6/2018 | 12/7/2018 | 12/7/2018 | A | PASS |
Mark Moncarr
|
|
|
Max Phone #: ###-#### Ok cover 3-2" pvc on S side of river at new structure.
|
Electrical Rough-In | 11/27/2018 | 11/28/2018 | 11/28/2018 | A | PASS |
Mark Moncarr
|
|
|
concrete in control building slab // Max Phone #: ###-#### Ok cover ufer.
|
Electrical Rough-In | 11/5/2018 | 11/5/2018 | 11/5/2018 | P | PASS |
Mark Moncarr
|
|
|
Max Phone #: ###-#### Ok cover grd work pumphouse
|
Electrical Rough-In | 10/24/2018 | 10/25/2018 | 10/25/2018 | A | PART |
Mark Moncarr
|
|
|
MAx Phone #: ###-#### Ok cover ground work conduit to new pump house.
|
Electrical Rough-In | 10/24/2018 | 10/24/2018 | 10/24/2018 | P | PASS |
Mark Moncarr
|
|
|
Max Phone #: ###-#### Ok cover 2in pvc to power panel for new pump house.
|