Final | 1/30/2019 | 1/30/2019 | 1/30/2019 | P | PASS |
James Ady
|
|
|
Final for cell site. Contact Seth VanWassenhove Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Final ok
|
Electrical Rough-In | 1/16/2019 | 1/16/2019 | 1/16/2019 | P | PASS |
James Ady
|
|
|
All equipment on rooftop checked and ok for final after ID power has energized service.
|
Final | 1/14/2019 | 1/16/2019 | 1/16/2019 | A | CANC |
James Ady
|
|
|
Call Seth VanWassenhove 1 hour prior to inspection for access, so he can meet you down there. Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek
|
Rough-In Permanent Service | 11/26/2018 | 11/28/2018 | 11/28/2018 | A | PASS |
Rock A. Hudson
|
|
|
Contact Seth VanWassenhove Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek ok to cover 2 conduits above meter pack and 1 on front of building with material that looks like rain gutter. Cell tower to be installed on roof. Using a spare meter on meter pack. p/s u/g n ok
|