Final | 1/23/2019 | 1/24/2019 | 1/24/2019 | A | PASS |
Mark Moncarr
|
|
|
Please call one hour beforehand so we can meet you. Thank you! Phone #: ###-#### Inspection requested via web by Rob Maes Ok final. Contractor verified UL listing with me on-site. All labeling as per code. Correct brkr size and wire.
|
Final | 1/22/2019 | 1/23/2019 | 1/23/2019 | A | FAIL |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Rob Maes RI inspection was never done. Job was scheduled on the 4th of Jan. I noted I was here from 1245-115. No response. Components installed need to be brought to inspection when called back in to verify UL listing.
|
Electrical Rough-In | 1/4/2019 | 1/7/2019 | 1/7/2019 | P | NR |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Rob Maes Nobosy on site. Was at job from 1245-115. Called and left message.
|