Final | 6/18/2019 | 6/19/2019 | 6/19/2019 | A | PASS |
Eric Story
|
|
|
I Have made all The Corrections And Its Ready For Final Final. Please Call Me When Your On Your Way And IWill Meet ya there Sir Thanks For The Help Dave Phone #: ###-#### Inspection requested via web by jason shifflett Corrections fixed final ok Occ card signed
|
Permanent Service | 5/14/2019 | 5/14/2019 | 5/14/2019 | P | PASS |
Eric Story
|
|
|
Erick I Put In The Service ITalked To You About For The Futre Car Charger And I Guess I Never Called It In Old Age Lpl Its Ready So I Can Get A Meter Idaho Power Is There Today Installing Meters And Service To The Units Thanks Man Phone #: ###-#### Inspection requested via web by jason shifflett p/s u/g n ok
|
Electrical Rough-In | 5/12/2019 | 5/13/2019 | 5/13/2019 | A | PASS |
Eric Story
|
|
|
Eric I Dont Know If You Need To Inspect The Pole Bases But They Are Done And The Building Inspector Said They Can Pour I Have The Photos Of The Conduit But I Have To be In Kuna At 7.00 And Should Be back To Meet Ya Thanks Dave Phone #: ###-#### Inspection requested via web by jason shifflett Light poles ok to cover
|
Rough-In Permanent Service | 1/23/2019 | 1/24/2019 | 1/24/2019 | A | PASS |
Eric Story
|
|
|
We Are Ready For 10 Units And Permanent Service For The Main Building Thanks Dave Phone #: ###-#### Inspection requested via web by jason shifflett AFC 13,947 on selected transformer Remaining units ok to cover p/s u/g n ok 17 meters needed
|
Electrical Rough-In | 1/15/2019 | 1/15/2019 | 1/15/2019 | P | PASS |
Eric Story
|
|
|
We Have 6 Lower Units Ready For Rough In Inspection Thanks Phone #: ###-#### Inspection requested via web by jason shifflett Lower 6 units only ok to cover
|
Electrical Rough-In | 12/27/2018 | 12/28/2018 | 12/28/2018 | A | PASS |
Eric Story
|
|
|
We Need A Partial Rough In And Cover For The Lidis In Coridor And Stairwells For Sheeting And Siding Thanks Dave Phone #: ###-#### Inspection requested via web by jason shifflett Corridor ceilings and stairs ok to cover
|