Final | 3/1/2019 | 3/4/2019 | 3/4/2019 | A | PASS |
Mark Moncarr
|
|
|
Steve Phone #: ###-#### Ok final. GFI needed installed in 2nd office W side 6' from sink. Electrician installed while there. Verified brkr and max fuse size on A/C's.
|
Electrical Rough-In | 2/8/2019 | 2/8/2019 | 2/8/2019 | P | PASS |
Mark Moncarr
|
|
|
Electrical Ceiling Inspection; Contact Steve McCloy Phone #: ###-#### Inspection requested via web by Steve McCloy Ok cover 4 ceilings exam rooms.
|
Electrical Rough-In | 1/3/2019 | 1/4/2019 | 1/4/2019 | A | PASS |
Mark Moncarr
|
|
|
Call Steve when in route if possible Phone #: ###-#### Inspection requested via web by Steve McCloy Ok cover upper and lower levels.
|
Electrical Rough-In | 1/2/2019 | 1/4/2019 | 1/3/2019 | P | CANC |
Mark Moncarr
|
|
|
Call Steve when in route if possible. Phone #: ###-#### >> Inspection requested via web by Steve McCloy Inspection cancelled from web by: Steve McCloy
|