Final | 5/2/2019 | 5/3/2019 | 5/3/2019 | A | PASS |
Rock A. Hudson
|
|
|
Contact - Neil Adams ###-#### Phone #: ###-#### Inspection requested via web by Todd Alder No card posted. Final ok
|
Final | 4/30/2019 | 5/1/2019 | 5/1/2019 | A | FAIL |
Rock A. Hudson
|
|
|
Contact is Neil Adams @ ###-#### Phone #: ###-#### Inspection requested via web by Todd Alder 110.26(A)(4)- Disconnect door shall open to a minimum of 90 degrees. Disconnect located in office. Move or remove. 210.63- A receptacle outlet shall be located with in 25' of AC unit. 314.29- Covers for conduit bodies shall be accessible with out damage to wall finish. LB located to right of main disconnect. 406.5- Receptacle outlets shall be securely mounted in place. Single receptacle mezz. 440.6- AC overcurrent protection shall not exceed value noted on nameplate. 50 amp installed 40 amp max. BCC4 05-32- Code violation not to be retained.
|
Electrical Rough-In | 2/20/2019 | 2/21/2019 | 2/21/2019 | A | PASS |
Tom Saunders
|
|
|
Bathroom rough in needs looked at. Please call Neil (###-####) 30 minutes before inspection so I can make sure the door is unlocked. Phone #: ###-#### Inspection requested via web by Neil Adams... ok to cover
|
Electrical Rough-In | 1/28/2019 | 1/29/2019 | 1/29/2019 | P | PASS |
Eric Story
|
|
|
please call Neil Adams 30 minutes prior to inspection to ensure the building is unlocked. Phone #: ###-#### Inspection requested via web by Neil Adams Mezzanine area ceiling deck ok to cover
|