Final | 11/6/2019 | 11/7/2019 | 11/7/2019 | A | PASS |
Eric Story
|
|
|
Home owner will be there all day Phone #: ###-#### Inspection requested via web by Charles Davis Final ok for work performed, job finished by others on permit # ELE19-04258 as specified on permit details
|
Rough-In Permanent Service | 2/18/2019 | 2/19/2019 | 2/19/2019 | A | PASS |
Daryl DeGrange
|
|
|
copper grounding installed and encased in 2" of concrete-have pictures of installation Phone #: ###-#### Inspection requested via web by Charles Davis rough-in p/s u/g n ok
|
Rough-In Permanent Service | 2/14/2019 | 2/15/2019 | 2/15/2019 | A | FAIL |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Charles Davis 250.32(A)- Seperate garage shall have a grounding electrode system and conductor installed. 314.25- Recessed Can junction box covers shall be completely installed as per instructions. 2 mechanical room, 1 kitchen, 1 down front bedroom. 440.6- Furnace shall be fed by minimum circuit notedd on name plate. 20 amp needed 15 amp installed.
|