Final | 6/20/2019 | 6/21/2019 | 6/21/2019 | A | PASS |
Tom Saunders
|
|
|
garage code 2019 Phone #: ###-#### Inspection requested via web by Darryn Coburn....corrections made ok to final
|
Final | 6/17/2019 | 6/18/2019 | 6/18/2019 | A | FAIL |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn 110.3- Devices shall be wired as per manufacturers instructions. Reverse polarity in laundry. 210.8(A)(2)- Unfinished space off garage receptacles shall have GFCI protection. 314.16- Boxes shall have sufficient subic inch rating for conductors installed. Island receptacle box 8 cubic inches with 11.25 of conductor cubic inch installed. 348.30- FMC shall be secured with in 12" of a termination. Furnace, disposal. 406.5- Master bed USB receptacle shall be flush or project from face plate.
|
Rough-In Permanent Service | 3/4/2019 | 3/4/2019 | 3/4/2019 | P | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn... rough ok to cover p/s u/g new ok
|