Final | 3/18/2019 | 3/19/2019 | 3/19/2019 | P | PASS |
Mark Moncarr
|
|
|
This was a 2.0 project -- a 4 panel add on to a pre-existing system. Apologies, I made a mistake and did not schedule a rough-in. Hopefully we can move forward with a final. Give me a call about an hour before and I am happy to meet you on site if needed. Phone #: ###-#### Inspection requested via web by Rob Maes Ok final 4 panels added to existing system.
|