Final | 6/6/2019 | 6/7/2019 | 6/7/2019 | A | PASS |
Rock A. Hudson
|
|
|
Inspection requested via web by BRS Permitting Final ok
|
Electrical Rough-In | 5/16/2019 | 5/17/2019 | 5/17/2019 | A | PASS |
Rock A. Hudson
|
|
|
If possible, please call the number above before heading out to the jobsite. Thank you! Phone #: ###-#### Inspection requested via web by BRS Permitting Different panels installed than spec'ed on print. Resubmit with accurate materials noted. Listings confirmed.
|