Final | 4/16/2019 | 4/17/2019 | 4/17/2019 | A | NH |
Tom Saunders
|
|
|
Call Breckee Brown for info on scheduling a time to meet on site or have owner be home will scheduled ###-####...called and spoke with Jenifer in permiting for contractor and explained issue and need for access to do inspection...she stated she will address
|
Final | 4/16/2019 | 4/16/2019 | 4/16/2019 | P | FAIL |
Eric Story
|
|
|
Plans have been left in meter box Phone #: ###-#### Inspection requested via web by Brecklee Brown No access again! double fee accessed, if no one on site on next inspection a no-hold will be placed on contractor. will schedule a phone call with contractor to schedule a inspection due to lack of rough-in and access to property.
|
Final | 3/13/2019 | 3/14/2019 | 3/14/2019 | A | FAIL |
Tom Saunders
|
|
|
Plans have been left on site Phone #: ###-#### Inspection requested via web by Brecklee Brown.... no access to verify panels, wiring, and OCPD rough inspection should of been scheduled to verify UL listing on equipment installed next scheduled inspection will require installer to be there to verify equipment installed on ground
|