Final | 5/14/2019 | 5/15/2019 | 5/15/2019 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Steven Ragan Final ok
|
Final | 5/10/2019 | 5/14/2019 | 5/14/2019 | A | FAIL |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Steven Ragan 210.8(B)- All 15 and 20 amp receptacle outlets located with in 6' of a sink shall have GFCI protection. Refer, disposal.
|
Final | 5/10/2019 | 5/13/2019 | 5/10/2019 | A | CANC |
Rock A. Hudson
|
|
|
Phone #: ###-#### >> Inspection requested via web by Steven Ragan Inspection cancelled from web by: Steven Ragan
|
Final | 5/9/2019 | 5/10/2019 | 5/10/2019 | A | FAIL |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Steven Ragan Wet floor glue through out. Recall.
|
Electrical Rough-In | 4/23/2019 | 4/24/2019 | 4/24/2019 | A | PASS |
Rock A. Hudson
|
|
|
Ceiling rough-in Phone #: ###-#### Inspection requested via web by Steven Ragan Grid rough in ok cover
|
Electrical Rough-In | 4/19/2019 | 4/22/2019 | 4/22/2019 | A | FAIL |
Rock A. Hudson
|
|
|
Ceiling rough-in Phone #: ###-#### Inspection requested via web by Steven Ragan 300.11- Cables and raceways shall not be supported by the ceiling assembly including ceiling suport wires. Cables moved from short support wires to ceiling support wires.
|
Electrical Rough-In | 4/18/2019 | 4/19/2019 | 4/19/2019 | A | FAIL |
Rock A. Hudson
|
|
|
Ceiling rough-in Phone #: ###-#### Inspection requested via web by Steven Ragan 300.11- Support wires used to support cables and raceways shall be secured at both ends. 314.25- Boxes covers shall be installed. break room top of wall.
|
Electrical Rough-In | 3/20/2019 | 3/20/2019 | 3/20/2019 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Steven Ragan Wall rough in ok cover
|
Electrical Rough-In | 3/18/2019 | 3/19/2019 | 3/19/2019 | P | FAIL |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Steven Ragan 330.30 MC cobale shall not be installed where subject to physical damage. Stand offs required to remove MC from interior of studs
|