Final | 4/22/2019 | 4/23/2019 | 4/23/2019 | P | PASS |
Mark Moncarr
|
|
|
solar install complete per approved plans; approved plans on site; give customer a call on your way out and either he or his father will be there to open the garage door. His number is ###-####. He''s hoping for the inspection to be later in the day if possible. Thanks guys, Ryan King Phone #: ###-#### Inspection requested via web by Ryan King Ok final. 40a fuses line side tap.
|
Final | 4/22/2019 | 4/23/2019 | 4/22/2019 | A | CANC |
Mark Moncarr
|
|
|
solar install complete per approved plans and ready for inspection. customer will be home for garage access; call me if you have any questions at ###-#### Thanks guys Phone #: ###-#### >> Inspection requested via web by Ryan King Inspection cancelled from web by: Ryan King
|
Electrical Rough-In | 4/18/2019 | 4/19/2019 | 4/19/2019 | A | PASS |
Mark Moncarr
|
|
|
listing inspection for solar equipment. roof top crew will be there from 8 to noon; equipment readily available for inspection and roof top attachment points easy to see. Thanks guys Phone #: ###-#### Inspection requested via web by Ryan King All items UL listed.
|
Permanent Service | 4/17/2019 | 4/18/2019 | 4/18/2019 | A | PASS |
Rock A. Hudson
|
|
|
Idaho power will be there between 10 to 11am for about thirty minutes to cut power long enough to add a tap. Call Jed if you have any questions at 1.801.875.3714 Phone #: ###-#### Inspection requested via web by Ryan King Confirmed grounding electrode system under concrete and listing of polaris taps using. p/s u/g rec ok
|