Final | 7/10/2019 | 7/11/2019 | 7/11/2019 | A | PASS |
Rock A. Hudson
|
|
|
(2) City of Boise Streetlights along Gowen.
Thank You Phone #: ###-#### Inspection requested via web by Steve Blackmer Checked wrong location on previous day. All complete. Good job. Final ok
|
Final | 7/10/2019 | 7/10/2019 | 7/11/2019 | P | PEND |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Tyler Bowen 110.12(B)- Equipment shall not be damaged. In ground junction box damaged on center light pole. 352.46- Where a conduit enters a box or enclosure a bushing or adapter shall be installed to protect conductors from damage. All in ground boxes. I checked wrong location on 7-10-19. Actual location installation complete and all good.
|
Electrical Rough-In | 6/3/2019 | 6/4/2019 | 6/4/2019 | A | PASS |
James Ady
|
|
|
Not sure if you need to inspect the public works street lights before we pour but i have called them for inspection tomorrow. If you need to see them before concrete also please do so. Thanks Phone #: ###-#### Inspection requested via web by Tyler Bowen This is a Public works project. Did look at underground. OK to cover
|