Final | 7/1/2019 | 7/2/2019 | 7/2/2019 | A | PASS |
Tom Saunders
|
|
|
Mike is the onsite contact. Phone #: ###-#### Phone #: ###-#### Inspection requested via web by Matt Sovic... ok to final
|
Final | 6/30/2019 | 7/1/2019 | 7/1/2019 | P | NR |
Tom Saunders
|
|
|
Mike is the onsite contact. Late afternoon around 4:30 if at all possible Phone #: ###-#### Inspection requested via web by Matt Sovic... GFCI protection not complete, L/Os not installed on 240V 3 phase equipment, demo of temp lighting, wiring thru grid to outlets above grid needs addressed, panel labelling completed
|
Electrical Rough-In | 7/1/2019 | 7/1/2019 | 7/1/2019 | P | PASS |
Tom Saunders
|
|
|
Mike is the onsite contact. Late afternoon around 4:30 if at all possible Phone #: ###-#### Inspection requested via web by Matt Sovic... grid ok to cover
|
Final | 6/27/2019 | 6/28/2019 | 6/28/2019 | A | FAIL |
Daryl DeGrange
|
|
|
Phone #: 3858813470 >> Inspection requested via mobile web by Caleb Buttars job not complete, apprentices installing electrical devices without supervision.
|
Electrical Rough-In | 5/13/2019 | 5/14/2019 | 5/14/2019 | P | PASS |
James Ady
|
|
|
1:00 pm would be great if at all possible. Phone #: ###-#### Inspection requested via web by Matt Sovic Corrections made rough in ok walls only
|
Electrical Rough-In | 5/13/2019 | 5/13/2019 | 5/13/2019 | P | FAIL |
James Ady
|
|
|
Call ahead for lockbox combo - Lance ###-#### // Phone #: ###-#### Inspection requested via web by Matt Sovic 330.12 MC shall not be used where exposed to physical damage. 300.4A1 & 300.4D where ran through holes less than 1 1/4in from the face of framing member, it shall be protected. Multiple locations through out project. MC shall not be suppoted to the inside channel of Metal 2x4.
|