Final | 11/7/2019 | 11/8/2019 | 11/8/2019 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton No card posted. Final ok
|
Final | 9/10/2019 | 9/11/2019 | 9/11/2019 | A | PART |
Rock A. Hudson
|
|
|
partial final Phone #: ###-#### Inspection requested via web by Kerri Hamilton Corrections complete. TCO ok
|
Final | 9/8/2019 | 9/9/2019 | 9/9/2019 | A | FAIL |
Rock A. Hudson
|
|
|
Temp final Phone #: ###-#### Inspection requested via web by Kerri Hamilton 210.8(B)- All 120 volt 15 or 20 amp receptacle outlets located within 6' of a sink shall have GFCI protection. Bar above sink. 210.71- Conference rm 238 sq.ft., required floor receptacle shall be located at least 6' from a wall. 314.25- All boxes shall have covers. Disposal receptacle not trimmed. 330.30- MC cable shall be secured with in 12" of a box and supports not to exceed 4 1/2'. Front entry MC in ceiling, MC in conference rm bench to receptacles. OK to move furniture in where needed.
|
Electrical Rough-In | 8/20/2019 | 8/20/2019 | 8/20/2019 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Grid and cloud rough in ok cover
|
Electrical Rough-In | 7/8/2019 | 7/9/2019 | 7/9/2019 | A | PASS |
Mark Moncarr
|
|
|
Marcelo Phone #: ###-#### Ok cover perimeter ceiling in Teller area and conf rm. Conf rm has floor box.
|
Electrical Rough-In | 6/28/2019 | 6/28/2019 | 6/28/2019 | P | CANC |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
|
Electrical Rough-In | 6/17/2019 | 6/17/2019 | 6/17/2019 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Walls only rough in ok cover
|
Electrical Rough-In | 5/24/2019 | 5/24/2019 | 5/24/2019 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Underslab rough in ok cover
|