Final | 9/23/2019 | 9/23/2019 | 9/23/2019 | P | PASS |
James Ady
|
|
|
Please call Lynn at ###-#### prior to arrival. Phone #: ###-#### Inspection requested via web by Lynn Proctor corrections made final ok
|
Final | 9/16/2019 | 9/17/2019 | 9/17/2019 | P | FAIL |
Rock A. Hudson
|
|
|
Please call Lynn prior to arrival. Phone #: ###-#### Inspection requested via web by Lynn Proctor 210.71- Meeting rooms at least 215 sq.ft shall have a receptacle located in the floor. This floor receptacle shall be installed in a listed floor box as per 314.27(B). All other areas checked out OK. OK to move in furniture.
|
Electrical Rough-In | 9/12/2019 | 9/12/2019 | 9/12/2019 | P | CANC |
Rock A. Hudson
|
|
|
Please call Dan prior to arrival. Thank you! Phone #: ###-#### >> Inspection requested via web by Lynn Proctor Inspection cancelled from web by: Lynn Proctor
|
Electrical Rough-In | 8/19/2019 | 8/20/2019 | 8/20/2019 | P | PASS |
Rock A. Hudson
|
|
|
Please call Lynn prior to arrival. A ceiling grid inspection is needed. Phone #: ###-#### Inspection requested via web by Lynn Proctor Grid rough in ok cover
|
Electrical Rough-In | 7/8/2019 | 7/8/2019 | 7/8/2019 | P | PASS |
Rock A. Hudson
|
|
|
Please call Lynn prior to arrival. Thank you! Phone #: ###-#### Inspection requested via web by Lynn Proctor Walls only rough in ok cover
|