Final | 1/7/2020 | 1/13/2020 | 1/13/2020 | A | CANC |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Curtis Hoovestol Needed rough in inspection.
|
Electrical Rough-In | 1/13/2020 | 1/13/2020 | 1/13/2020 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Curtis Hoovestol Explained line- load make up needed for GFCI devices. Rough in ok cover
|
Electrical Rough-In | 11/22/2019 | 11/25/2019 | 11/25/2019 | A | FAIL |
Rock A. Hudson
|
|
|
Would like to meet with Rock again. He gave me my preliminary meeting. I have the wires pulled through the walls and getting close to outlets and closing in. Thanks. Phone #: ###-#### Inspection requested via web by Curtis Hoovestol Building permit finaled in january. 250.24(A)(5)- Grounding and grounded conductors shall be connected on load side of service. Need a equipment grounding conductor to sub panel in shop. 250.118- All non current carrying metal parts of equiment shall be connected to as equipment grounding conductor. Complete make-up so inspector can inspect connections. 314.29- Covers for conduit bodies shall remain accessible, Owner to build access for LB under panel. 334.30- NM cables shall be secured with in 12'" of entering panel. 406.12- All receptacle outlets installed in a residential garage shall be tamper resistant type.
|
Electrical Rough-In | 10/3/2019 | 10/7/2019 | 10/7/2019 | A | CANC |
Rock A. Hudson
|
|
|
I wasn''t sure what "type" of inspection I needed. I am starting to wire up my workshop and saw the pre-construction meeting is mandatory. That is what I am trying to schedule. Phone #: ###-#### Inspection requested via web by Curtis Hoovestol Needed conference.
|
Conference | 10/7/2019 | 10/7/2019 | 10/7/2019 | P | DONE |
Rock A. Hudson
|
|
|
I wasn''t sure what "type" of inspection I needed. I am starting to wire up my workshop and saw the pre-construction meeting is mandatory. That is what I am trying to schedule. Phone #: ###-#### Inspection requested via web by Curtis Hoovestol Pamphlet given, discussed wall cover required for all wiring below 8', 6" of useable wire at each box prior to termination, type of receptacles, tamper, WR, GFCI protection, inspections required. Owner has done work in past and has good grasp on scope of work.
|