Final | 1/17/2020 | 1/21/2020 | 1/21/2020 | P | PASS |
Eric Story
|
|
|
Kenny Phone #: ###-#### Final ok
|
Final | 12/23/2019 | 12/24/2019 | 12/24/2019 | P | CANC |
Eric Story
|
|
|
kenny Phone #: ###-#### No final at this point
|
Electrical Rough-In | 12/24/2019 | 12/24/2019 | 12/24/2019 | P | PASS |
Eric Story
|
|
|
kenny Phone #: ###-#### Ok to isulate attic
|
Electrical Rough-In | 10/25/2019 | 10/28/2019 | 10/28/2019 | A | PASS |
Eric Story
|
|
|
Kenny Phone #: ###-#### Kitchen and bath ok to cover
|
Conference | 10/17/2019 | 10/21/2019 | 10/21/2019 | P | DONE |
Eric Story
|
|
|
Kenny Phone #: ###-#### Discussed remodel of small kitchen and bath, very straight foward project, no service change required and only touching areas as noted.
|