Final | 2/3/2020 | 2/4/2020 | 2/4/2020 | A | PASS |
Tom Saunders
|
|
|
MAIN CONTACT - Levi Henry ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting.... labelling, disconnect, and OCPD ok
|
Final | 12/5/2019 | 12/6/2019 | 12/6/2019 | A | FAIL |
Tom Saunders
|
|
|
Please call our onsite contact, Ashley: ###-#### before arrival. (This was scheduled yesterday, but only the building was scheduled, so we have to schedule both for 12/6) Phone #: ###-#### Inspection requested via web by BRS Permitting.... permit failing along with contractors permit ELE19-04055 for service change 1..panel needs complete labelling ...every circuit and circuit modification shall be legibly as to its clear, evident and specific use or purpose..408.4(A)
|
Electrical Rough-In | 11/18/2019 | 11/19/2019 | 11/19/2019 | P | PASS |
Tom Saunders
|
|
|
Please call Brian Prussia at 208.241.5835 if you have any questions. Phone #: ###-#### Inspection requested via web by BRS Permitting... UL l.isted equipment verified
|