Final | 6/30/2020 | 7/1/2020 | 6/30/2020 | A | PASS |
Tom Saunders
|
|
|
Final for Rough-In per Tom''s request. Phone #: ###-#### Inspection requested via web by Bryan Lawley...ok to final
|
Electrical Rough-In | 4/30/2020 | 5/1/2020 | 5/1/2020 | P | PASS |
Tom Saunders
|
|
|
Electrical Pre-Wire Rough-In. Separate Building and Electrical Permit will be pulled for Solar Array. Please Call Jed at 801.875.3714 with any questions. Phone #: ###-#### Inspection requested via web by Bryan Lawley...ok to cover
|
Electrical Rough-In | 4/29/2020 | 4/30/2020 | 4/30/2020 | A | FAIL |
Tom Saunders
|
|
|
Solar Pre-Wire for Future Solar System. Call Jed with any questions at 801.875.3714. Separate Building and Electrical Permit will be pulled. Phone #: ###-#### Inspection requested via web by Bryan Lawley... 1) wiring neat and workman like manner...110.12 2) NMB wiring...334.30
|
Electrical Rough-In | 4/29/2020 | 4/30/2020 | 4/29/2020 | P | CANC |
Tom Saunders
|
|
|
Solar Pre-Wire for Future Solar System. Call Jed with any questions at 801.875.3714. Separate Building and Electrical Permit will be pulled. Phone #: ###-#### >> Inspection requested via web by Bryan Lawley Inspection cancelled from web by: Bryan Lawley
|